← ICG BECKLEY LLC

ICG BECKLEY LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Power wires and cables; insulation and protection.

    violationRecord 5021126
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.517 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5021125
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $432.00 proposed penalty

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5092855
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  4. Slip or fall of person

    accidentRecord 220260300012
    BECKLEY POCAHONTAS MINE · 4605252

    Days away from work only

    Accident narrative

    The employee stated that EE became dizzy and fell off the ladder while plastering a stopping. The ladder was 4', and total height in area was around 9 1/2', EE fell between 2' and 3' to the ground.

  5. Protection from falls of roof, face and ribs.

    violationRecord 5092854
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5092853
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $642.00 proposed penalty

  7. Actions for excessive methane.

    violationRecord 5092852
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.323(a) · $313.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5092851
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  9. Slip or fall of person

    accidentRecord 220260260007
    BECKLEY POCAHONTAS MINE · 4605252

    Days away from work only

    Accident narrative

    EE was walking to the back of the machine to put oil in and slipped while crossing the cable.

  10. Spot Inspections

    inspectionRecord F020A5B
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 9.3 on-site hours reported

  11. Mine ventilation plan; submission and approval.

    violationRecord 5099299
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $2,133.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 5092850
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · $8,315.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5022045
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $883.00 proposed penalty

  14. Electric equipment; examination, testing and maintenance.

    violationRecord 5022044
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $642.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5092849
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  16. Methane monitors.

    violationRecord 5092848
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.342(a)(4) · $165.00 proposed penalty

  17. Inspection of fire suppression devices.

    violationRecord 5021124
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1107-16(b) · $193.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5021123
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $642.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5021122
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  20. Power wires and cables; insulation and protection.

    violationRecord 5021121
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.517 · $6,540.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F00704B
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 9.0 on-site hours reported

  22. Escapeways; bituminous and lignite mines.

    violationRecord 9849762
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.380(f)(1) · $313.00 proposed penalty

  23. Ventilation controls.

    violationRecord 5092847
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.333(h) · $151.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 5092846
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  25. Mechanical equipment guards.

    violationRecord 5092845
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1722(c) · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.