Highland Mining Company safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Loading and haulage equipment; installations.
Reylas Surface Mine · 460920430 CFR 77.1605(b) · $151.00 proposed penalty
Drilling; general.
Reylas Surface Mine · 460920430 CFR 77.1007(b) · $151.00 proposed penalty
Loading and haulage; general.
Reylas Surface Mine · 460920430 CFR 77.1600(c) · $177.00 proposed penalty
Loading and haulage equipment; installations.
Reylas Surface Mine · 460920430 CFR 77.1605(k) · Significant and substantial (S&S) · $267.00 proposed penalty
Machinery and equipment; operation and maintenance.
Reylas Surface Mine · 460920430 CFR 77.404(a) · Significant and substantial (S&S) · $818.00 proposed penalty
Regular Safety and Health Inspection
Reylas Surface Mine · 460920442.0 on-site hours reported
Electric equipment; examination, testing, and maintenance.
Reylas Surface Mine · 460920430 CFR 77.502 · $151.00 proposed penalty
Health Technical Investigation
Reylas Surface Mine · 46092044.3 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
Reylas Surface Mine · 460920430 CFR 77.1606(c) · $151.00 proposed penalty
Surface installations; general.
Reylas Surface Mine · 460920430 CFR 77.200 · $151.00 proposed penalty
Regular Safety and Health Inspection
Reylas Surface Mine · 460920439.5 on-site hours reported
Storage of materials.
Reylas Surface Mine · 460920430 CFR 77.208(d) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Reylas Surface Mine · 460920430 CFR 77.404(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Reylas Surface Mine · 460920430 CFR 77.1606(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
Reylas Surface Mine · 460920444.5 on-site hours reported
Regular Safety and Health Inspection
Reylas Surface Mine · 460920417.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.