ACTIVE / OPERATOR PORTFOLIO

High Carbon Processing, LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0194593

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
High Carbon Processing Plant4609657 · Active6/8 quarters reportedBarbour, WVFacility · MSHA: Coal (Bituminous)0179,557115141.8

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

11

1 significant & substantial (S&S)

  1. 2025 Q11
  2. 2025 Q22
  3. 2025 Q30
  4. 2025 Q41
  5. 2026 Q14
  6. 2026 Q23
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

5

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q21
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q21
  7. 2026 Q32
  8. 2026 Q4 *0

Proposed penalties · USD

2,245.00

9 of 11 violations with amounts

  1. 2025 Q1151
  2. 2025 Q2302
  3. 2025 Q3—
  4. 2025 Q41,037
  5. 2026 Q1453
  6. 2026 Q2302
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

141.75

10 inspections · 10 with hours

  1. 2025 Q1—
  2. 2025 Q235.75
  3. 2025 Q3—
  4. 2025 Q443.50
  5. 2026 Q113.00
  6. 2026 Q244.50
  7. 2026 Q35.00
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q110151.00000—
2025-Q220302.0010235.8
2025-Q300—000—
2025-Q4111,037.0000143.5
2026-Q140453.0010313.0
2026-Q230302.0010344.5
2026-Q300—2015.0
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. accident220262330029
    High Carbon Processing Plant · 4609657

    HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Injured employee was moving a vessel flight inside of the prep plant when they dropped it on their left middle finger resulting in a fracture. Employee was wearing gloves at the time of the incident.

  2. inspectionF0093F4
    High Carbon Processing Plant · 4609657

    Impoundment Spot Inspection · 5.0 on-site hours

  3. accident220262080007
    High Carbon Processing Plant · 4609657

    SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Injured employee stated that while descending a ladder the chain hoist that EE had previously installed fell and knocked the ladder out from under EE causing EE to fall to the concrete floor below resulting in a fracture to EE's right wrist.

  4. violation9934251
    High Carbon Processing Plant · 4609657

    77.1110 · $151.00 proposed

  5. violation9934250
    High Carbon Processing Plant · 4609657

    77.410(b) · $151.00 proposed

  6. inspectionF014DDD
    High Carbon Processing Plant · 4609657

    Regular Safety and Health Inspection · 34.3 on-site hours

  7. inspectionF0093EC
    High Carbon Processing Plant · 4609657

    Impoundment Spot Inspection · 4.0 on-site hours

  8. inspectionF018E5A
    High Carbon Processing Plant · 4609657

    Non-Injury Accident Investigation · 6.3 on-site hours

  9. violation9930828
    High Carbon Processing Plant · 4609657

    Description not reported

  10. accident220261390011
    High Carbon Processing Plant · 4609657

    FIRE · ACCIDENT ONLY

    Accident narrative

    An unplanned fire not extinguished within 30 minutes of discovery occurred on a Caterpillar 325c excavator on the course refuse disposal area of the preparation plant. The machine was owned and operated by Doss Enterprises, LLC. No injuries resulted from the incident.

  11. inspectionF0133F4
    High Carbon Processing Plant · 4609657

    Spot Inspection · 1.5 on-site hours

  12. inspection7043273
    High Carbon Processing Plant · 4609657

    Impoundment Spot Inspection · 3.5 on-site hours

  13. violation8018449
    High Carbon Processing Plant · 4609657

    77.502 · $151.00 proposed

  14. accident220260130022
    High Carbon Processing Plant · 4609657

    ENTRAPMENT · ACCIDENT ONLY

    Accident narrative

    A dozer entered void on the #2 Met Stockpile at the #3 Feeder resulting in an entrapment. No injuries resulted.

  15. inspection7043269
    High Carbon Processing Plant · 4609657

    Non-Injury Accident Investigation · 8.0 on-site hours

  16. violation9584656
    High Carbon Processing Plant · 4609657

    Description not reported

  17. violation8018447
    High Carbon Processing Plant · 4609657

    77.400(a) · $151.00 proposed

  18. violation8018446
    High Carbon Processing Plant · 4609657

    77.410(a) · $151.00 proposed

  19. violation9584646
    High Carbon Processing Plant · 4609657

    77.410(a) · S&S · $1,037.00 proposed

  20. inspectionF0133E6
    High Carbon Processing Plant · 4609657

    Regular Safety and Health Inspection · 43.5 on-site hours

  21. inspectionF009BB1
    High Carbon Processing Plant · 4609657

    Regular Safety and Health Inspection · 30.0 on-site hours

  22. violation9584761
    High Carbon Processing Plant · 4609657

    77.502 · $151.00 proposed

  23. violation9584760
    High Carbon Processing Plant · 4609657

    77.809 · $151.00 proposed

  24. accident220251000009
    High Carbon Processing Plant · 4609657

    FALLING/SLIDING/ROLLING MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Injured employee was hosting the chute below the scalping screen on the rotary breaker floor when a piece of rock fell and struck injured employee's hard hat causing a laceration requiring sutures to close. No time was missed as a result of the incident.

  25. inspectionF006D6D
    High Carbon Processing Plant · 4609657

    Impoundment Spot Inspection · 5.8 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this operator in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED—0 of 0 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
High Carbon Processing Plant4609657 · Barbour, West Virginia0———Preparation plant2 eligible mines / 2 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.