Herrington Aggregates, LP safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Records of training.
Herrington Aggregates · 410576830 CFR 46.9(c)(1) · $151.00 proposed penalty
Inspection and cover plates.
Herrington Aggregates · 410576830 CFR 56.12032 · $151.00 proposed penalty
Regular Safety and Health Inspection
Herrington Aggregates · 41057687.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Herrington Aggregates · 410576830 CFR 50.30(a) · $151.00 proposed penalty
Inspection.
Herrington Aggregates · 410576830 CFR 56.4201(a)(2) · $165.00 proposed penalty
Unguarded conveyors with adjacent travelways.
Herrington Aggregates · 410576830 CFR 56.14109(b)(1) · $165.00 proposed penalty
Regular Safety and Health Inspection
Herrington Aggregates · 410576821.0 on-site hours reported
Identification of power switches.
Herrington Aggregates · 410576830 CFR 56.12018 · $165.00 proposed penalty
Securing gas cylinders.
Herrington Aggregates · 410576830 CFR 56.16005 · $165.00 proposed penalty
Regular Safety and Health Inspection
Herrington Aggregates · 41057687.5 on-site hours reported
General requirements.
Herrington Aggregates · 410576830 CFR 56.4200(b)(1) · $165.00 proposed penalty
Safety defects; examination, correction and records.
Herrington Aggregates · 410576830 CFR 56.14100(b) · $165.00 proposed penalty
Compliance Follow-up Inspection
Herrington Aggregates · 41057681.0 on-site hours reported
First-aid materials.
Herrington Aggregates · 410576830 CFR 56.15001 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Herrington Aggregates · 410576830 CFR 50.30(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Herrington Aggregates · 410576811.0 on-site hours reported
Identification of power switches.
Herrington Aggregates · 410576830 CFR 56.12018 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Herrington Aggregates · 410576830 CFR 56.14100(b) · $151.00 proposed penalty
Danger signs.
Herrington Aggregates · 410576830 CFR 56.12021 · $151.00 proposed penalty
Grounding transformer and switchgear enclosures.
Herrington Aggregates · 410576830 CFR 56.12026 · $151.00 proposed penalty
Installation of transformers.
Herrington Aggregates · 410576830 CFR 56.12067 · Significant and substantial (S&S) · $366.00 proposed penalty
Testing grounding systems.
Herrington Aggregates · 410576830 CFR 56.12028 · Significant and substantial (S&S) · $366.00 proposed penalty
Extinguisher recharging or replacement.
Herrington Aggregates · 410576830 CFR 56.4203 · $151.00 proposed penalty
Correction of dangerous conditions.
Herrington Aggregates · 410576830 CFR 56.12030 · Significant and substantial (S&S) · $366.00 proposed penalty
Identification of power switches.
Herrington Aggregates · 410576830 CFR 56.12018 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.