103 (g) Written Notification Hazard Complaint Inspectio
Mitchell Plant · 12000635.0 on-site hours reported
Housekeeping.
Mitchell Plant · 120006330 CFR 56.20003(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Dust control.
Mitchell Plant · 120006330 CFR 56.9315 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Handling of materials
Mason City Plant · 1300095Days restricted activity only
Accident narrative
Employee was picking up a mill door liner and felt pain in EE's lower back. EE's supervisor called work care and the employee agreed to self-treat. During the follow up with work care on 7/20/2026. Employee was seen at occupational health on 7/22/2026 and placed on restricted duty.
Procedures during repairs or maintenance.
UNION BRIDGE MD · 180001730 CFR 56.14105 · Significant and substantial (S&S) · $818.00 proposed penalty
Procedures during repairs or maintenance.
UNION BRIDGE MD · 180001730 CFR 56.14105 · Significant and substantial (S&S) · $697.00 proposed penalty
Procedures during repairs or maintenance.
UNION BRIDGE MD · 180001730 CFR 56.14105 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Housekeeping.
UNION BRIDGE MD · 180001730 CFR 56.20003(a) · $177.00 proposed penalty
Housekeeping.
UNION BRIDGE MD · 180001730 CFR 56.20003(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Securing gas cylinders.
UNION BRIDGE MD · 180001730 CFR 56.16005 · $151.00 proposed penalty
Safe access.
UNION BRIDGE MD · 180001730 CFR 56.11001 · $504.00 proposed penalty
Inspection and cover plates.
UNION BRIDGE MD · 180001730 CFR 56.12032 · $592.00 proposed penalty
Written safety program.
UNION BRIDGE MD · 180001730 CFR 56.23002(a) · $151.00 proposed penalty
Bins, hoppers, silos, tanks, and surge piles.
UNION BRIDGE MD · 180001730 CFR 56.16002(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Written safety program.
UNION BRIDGE MD · 180001730 CFR 56.23002(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
UNION BRIDGE MD · 180001730 CFR 50.30(a) · $151.00 proposed penalty
Written safety program.
UNION BRIDGE MD · 180001730 CFR 56.23002(a) · $151.00 proposed penalty
Construction and maintenance of guards.
UNION BRIDGE MD · 180001730 CFR 56.14112(b) · $313.00 proposed penalty
Construction and maintenance of guards.
UNION BRIDGE MD · 180001730 CFR 56.14112(b) · $313.00 proposed penalty
Housekeeping.
UNION BRIDGE MD · 180001730 CFR 56.20003(a) · $209.00 proposed penalty
Construction and maintenance of ladders.
UNION BRIDGE MD · 180001730 CFR 56.11003 · $209.00 proposed penalty
Housekeeping.
UNION BRIDGE MD · 180001730 CFR 56.20003(a) · $209.00 proposed penalty
Requirement for container labels.
UNION BRIDGE MD · 180001730 CFR 47.41(a) · $151.00 proposed penalty
Electrical conductors.
UNION BRIDGE MD · 180001730 CFR 56.12004 · $151.00 proposed penalty
Parking procedures for unattended equipment.
UNION BRIDGE MD · 180001730 CFR 56.14207 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.