Heidelberg Materials US Cement LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Operating speeds and control of equipment.
UNION BRIDGE MD · 180001730 CFR 56.9101 · Significant and substantial (S&S) · $465.00 proposed penalty
Handtools (nonpowered)
EVANSVILLE PLANT · 3600185Days away from work only
Accident narrative
Use of sledgehammer to remove wear plates inside a mill. Employee missed the wedge, hit wear plate that a small metal piece broke off and punctured employee in right upper leg area.
Handling of materials
EVANSVILLE PLANT · 3600185No dys awy frm wrk,no rstr act
Accident narrative
Minor back strain from lifting old wear plates that were being removed from a miller lining.
Violation — cited standard not reported
UNION BRIDGE MD · 1800017$252.00 proposed penalty
Site-specific hazard awareness training.
UNION BRIDGE MD · 180001730 CFR 46.11(b)(4) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Storage of incompatible substances.
UNION BRIDGE MD · 180001730 CFR 56.16012 · Significant and substantial (S&S) · $13,436.00 proposed penalty
General requirements.
Logansport Cement Plant · 120006530 CFR 56.4200(b)(2) · $151.00 proposed penalty
New task training.
UNION BRIDGE MD · 180001730 CFR 46.7(a) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Immediate notification.
UNION BRIDGE MD · 180001730 CFR 50.10(d) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Non-Injury Accident Investigation
UNION BRIDGE MD · 180001733.0 on-site hours reported
Safety defects; examination, correction and records.
Logansport Cement Plant · 120006530 CFR 56.14100(c) · $177.00 proposed penalty
Heat sources.
Logansport Cement Plant · 120006530 CFR 56.4500 · $177.00 proposed penalty
Housekeeping.
Logansport Cement Plant · 120006530 CFR 56.20003(a) · $267.00 proposed penalty
Inspection.
Logansport Cement Plant · 120006530 CFR 56.4201(a)(1) · $151.00 proposed penalty
Housekeeping.
Logansport Cement Plant · 120006530 CFR 56.20003(a) · $267.00 proposed penalty
Housekeeping.
Logansport Cement Plant · 120006530 CFR 56.20003(a) · $267.00 proposed penalty
Housekeeping.
Logansport Cement Plant · 120006530 CFR 56.20003(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Identification of power switches.
Logansport Cement Plant · 120006530 CFR 56.12018 · $151.00 proposed penalty
Violation — cited standard not reported
UNION BRIDGE MD · 1800017Regular Safety and Health Inspection
Logansport Cement Plant · 120006553.0 on-site hours reported
General requirements.
Logansport Cement Plant · 120006530 CFR 56.4200(b)(2) · $151.00 proposed penalty
Horns and backup alarms.
Mitchell Plant · 120006330 CFR 56.14132(a) · $165.00 proposed penalty
Moving machine parts.
Mitchell Plant · 120006330 CFR 56.14107(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Moving machine parts.
Mitchell Plant · 120006330 CFR 56.14107(a) · $592.00 proposed penalty
Slip or fall of person
Logansport Cement Plant · 1200065No dys awy frm wrk,no rstr act
Accident narrative
EE slipped and fell on EE's right hip
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.