Heidelberg Materials US Cement LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Berms or guardrails.
Logansport Cement Plant · 120006530 CFR 56.9300(a) · $151.00 proposed penalty
Electrical conductors.
Logansport Cement Plant · 120006530 CFR 56.12004 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Moving machine parts.
Logansport Cement Plant · 120006530 CFR 56.14107(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Moving machine parts.
Logansport Cement Plant · 120006530 CFR 56.14107(a) · $151.00 proposed penalty
Correction of dangerous conditions.
Logansport Cement Plant · 120006530 CFR 56.12030 · $1,431.00 proposed penalty
Safety defects; examination, correction and records.
Logansport Cement Plant · 120006530 CFR 56.14100(b) · $193.00 proposed penalty
Protection of gas cylinder valves.
Logansport Cement Plant · 120006530 CFR 56.16006 · $193.00 proposed penalty
Correction of dangerous conditions.
Logansport Cement Plant · 120006530 CFR 56.12030 · $642.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Logansport Cement Plant · 120006530 CFR 56.12019 · $193.00 proposed penalty
Moving machine parts.
Logansport Cement Plant · 120006530 CFR 56.14107(a) · $193.00 proposed penalty
Electrical conductors.
Logansport Cement Plant · 120006530 CFR 56.12004 · $642.00 proposed penalty
Handling of materials
Mitchell Plant · 1200063No dys awy frm wrk,no rstr act
Accident narrative
Employee was working to get an airslide to flow material when dust from above dropped down onto the employee and into their eye.
Spot Inspection
Mitchell Plant · 12000632.0 on-site hours reported
Regular Safety and Health Inspection
Logansport Cement Plant · 120006559.8 on-site hours reported
Correction of dangerous conditions.
Logansport Cement Plant · 120006530 CFR 56.12030 · $1,431.00 proposed penalty
Safety defects; examination, correction and records.
Logansport Cement Plant · 120006530 CFR 56.14100(d) · $193.00 proposed penalty
General requirements.
Logansport Cement Plant · 120006530 CFR 56.4200(b)(2) · $432.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Logansport Cement Plant · 120006530 CFR 56.12019 · $432.00 proposed penalty
Insulation and fittings for power wires and cables.
Logansport Cement Plant · 120006530 CFR 56.12008 · $1,431.00 proposed penalty
Housekeeping.
Logansport Cement Plant · 120006530 CFR 56.20003(a) · $755.00 proposed penalty
Identification of power switches.
Logansport Cement Plant · 120006530 CFR 56.12018 · $193.00 proposed penalty
Housekeeping.
Mitchell Plant · 120006330 CFR 56.20003(b) · $267.00 proposed penalty
Housekeeping.
Mitchell Plant · 120006330 CFR 56.20003(b) · $592.00 proposed penalty
Moving machine parts.
Mitchell Plant · 120006330 CFR 56.14107(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
Mason City Plant · 130009530 CFR 50.20(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.