Harrod Concrete & Stone Co Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Harrod Concrete & Stone Co Inc · 150002031.0 on-site hours reported
Spot Inspection
Harrod Concrete & Stone Co Inc · 15000202.0 on-site hours reported
Safe access.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.11001 · $151.00 proposed penalty
Regular Safety and Health Inspection
Harrod Concrete & Stone Co Inc · 150002018.0 on-site hours reported
Housekeeping.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.20003(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Harrod Concrete & Stone Co Inc · 150002021.0 on-site hours reported
Spot Inspection
Harrod Concrete & Stone Co Inc · 150002038.0 on-site hours reported
Spillage and leakage.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.4102 · Significant and substantial (S&S) · $267.00 proposed penalty
Regular Safety and Health Inspection
Harrod Concrete & Stone Co Inc · 150002027.0 on-site hours reported
Housekeeping.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.20003(a) · $177.00 proposed penalty
Handling of materials
Harrod Concrete & Stone Co Inc · 1500020Dys awy frm wrk & restrctd act
Accident narrative
Employee notified me @ 8:25 am that they had hurt their shoulder shoveling under a belt line. They said they thought that they had pulled something in their right shoulder.
Safety defects; examination, correction and records.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Harrod Concrete & Stone Co Inc · 150002026.0 on-site hours reported
Safety defects; examination, correction and records.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.14100(b) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.14207 · Significant and substantial (S&S) · $151.00 proposed penalty
Dump site restraints.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.9301 · $151.00 proposed penalty
Regular Safety and Health Inspection
Harrod Concrete & Stone Co Inc · 150002026.0 on-site hours reported
Horns and backup alarms for surface equipment.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.14132(a) · $151.00 proposed penalty
Special Emphasis Programs
Harrod Concrete & Stone Co Inc · 15000201.5 on-site hours reported
Horns and backup alarms for surface equipment.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.14132(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.14100(b) · Significant and substantial (S&S) · $177.00 proposed penalty
Regular Safety and Health Inspection
Harrod Concrete & Stone Co Inc · 150002014.0 on-site hours reported
Location of self-rescue devices.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.15031(b) · $151.00 proposed penalty
Horns and backup alarms for surface equipment.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.14132(a) · $151.00 proposed penalty
Housekeeping.
Harrod Concrete & Stone Co Inc · 150002030 CFR 57.20003(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.