Hamilton County Coal, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
MINE NO. 1 · 110320330 CFR 75.1731(a) · $193.00 proposed penalty
Handtools (nonpowered)
Hamilton County Coal Processing · 1103242No dys awy frm wrk,no rstr act
Accident narrative
EE was swinging a sledge hammer, missed the bolt smashing EE's right pinky finger between (C) channel and wood end handle. Causing EE to receive stitches.
Insulating mats at power switches.
MINE NO. 1 · 110320330 CFR 77.513 · $193.00 proposed penalty
Switchboards; passageways and clearance.
MINE NO. 1 · 110320330 CFR 77.514 · $193.00 proposed penalty
Switchboards; passageways and clearance.
MINE NO. 1 · 110320330 CFR 77.514 · $193.00 proposed penalty
Insulating mats at power switches.
MINE NO. 1 · 110320330 CFR 77.513 · $193.00 proposed penalty
Water, sediment, or slurry impoundments and impounding structures; general.
Hamilton County Coal Processing · 110324230 CFR 77.216(d) · $177.00 proposed penalty
Spot Inspections
MINE NO. 1 · 1103203103(i) · 2.8 on-site hours reported
Shaft, Slope or Major Construction Spot Inspection
MINE NO. 1 · 110320312.0 on-site hours reported
Electric equipment and circuits; overload and short circuit protection.
MINE NO. 1 · 110320330 CFR 75.518 · $193.00 proposed penalty
Identification of circuit breakers.
MINE NO. 1 · 110320330 CFR 75.904 · $193.00 proposed penalty
Impoundment Spot Inspection
Hamilton County Coal Processing · 11032429.0 on-site hours reported
Accumulation of combustible materials.
MINE NO. 1 · 110320330 CFR 75.400 · $697.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
MINE NO. 1 · 110320330 CFR 75.1909(a)(10) · $465.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
MINE NO. 1 · 110320330 CFR 75.1910(i) · $465.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
MINE NO. 1 · 110320330 CFR 75.1909(a)(10) · $465.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
MINE NO. 1 · 110320330 CFR 75.1910(i) · $465.00 proposed penalty
Accumulation of combustible materials.
MINE NO. 1 · 110320330 CFR 75.400 · $288.00 proposed penalty
Accumulation of combustible materials.
MINE NO. 1 · 110320330 CFR 75.400 · $288.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
MINE NO. 1 · 110320330 CFR 75.1909(a)(10) · $465.00 proposed penalty
Condition and examination of firefighting equipment.
MINE NO. 1 · 110320330 CFR 75.1100-3 · $193.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
MINE NO. 1 · 110320330 CFR 75.1910(i) · $193.00 proposed penalty
Identification of circuit breakers.
MINE NO. 1 · 110320330 CFR 77.904 · $549.00 proposed penalty
Spot Inspections
MINE NO. 1 · 1103203103(i) · 2.5 on-site hours reported
Spot Inspections
MINE NO. 1 · 1103203103(i) · 3.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.