H&K Group, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Blooming Glen Quarry · 360430219.0 on-site hours reported
Regular Safety and Health Inspection
Hilltop Quarry · 36081659.0 on-site hours reported
Training plans.
Blooming Glen Quarry · 360430230 CFR 46.3(a) · $151.00 proposed penalty
Responsibility for independent contractor training.
Blooming Glen Quarry · 360430230 CFR 46.12(b)(1) · Significant and substantial (S&S) · $465.00 proposed penalty
New miner training.
Blooming Glen Quarry · 360430230 CFR 46.5(a) · Significant and substantial (S&S) · $184.00 proposed penalty
Safe access.
Blooming Glen Quarry · 360430230 CFR 56.11001 · Significant and substantial (S&S) · $209.00 proposed penalty
Closure of valves.
Hilltop Quarry · 360816530 CFR 56.4603(b) · $151.00 proposed penalty
Machinery
Penn/MD Quarry · 3608294Days restricted activity only
Accident narrative
EE was welding under the feeder at the primary plant at Penn MD Quarry when a welding bead dropped and fell down into EE's boot, burning the top of EE's left foot
Regular Safety and Health Inspection
HAZLETON QUARRY · 36090745.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
HAZLETON QUARRY · 36090744.0 on-site hours reported
Written safety program.
LOCUST RIDGE QUARRY · 360721430 CFR 56.23002(a) · $151.00 proposed penalty
Records of training.
LOCUST RIDGE QUARRY · 360721430 CFR 46.9(a) · $151.00 proposed penalty
Training plans.
LOCUST RIDGE QUARRY · 360721430 CFR 46.3(a) · $151.00 proposed penalty
Records of training.
LOCUST RIDGE QUARRY · 360721430 CFR 46.9(b)(5) · $151.00 proposed penalty
Correction of dangerous conditions.
LOCUST RIDGE QUARRY · 360721430 CFR 56.12030 · Significant and substantial (S&S) · $245.00 proposed penalty
Regular Safety and Health Inspection
LOCUST RIDGE QUARRY · 360721416.0 on-site hours reported
Housekeeping.
LOCUST RIDGE QUARRY · 360721430 CFR 56.20003(a) · Significant and substantial (S&S) · $165.00 proposed penalty
Electrical conductors.
Penn/MD Quarry · 360829430 CFR 56.12004 · $151.00 proposed penalty
Housekeeping.
Penn/MD Quarry · 360829430 CFR 56.20003(a) · Significant and substantial (S&S) · $177.00 proposed penalty
Correction of dangerous conditions.
Penn/MD Quarry · 360829430 CFR 56.12030 · $151.00 proposed penalty
Handtools (nonpowered)
Silver Hill Quarry · 3605616Days restricted activity only
Accident narrative
EE was cutting a belt and the knife slipped cutting EE's knee
Regular Safety and Health Inspection
Penn/MD Quarry · 360829411.3 on-site hours reported
Other
Penn/MD Quarry · 3608294Days restricted activity only
Accident narrative
According to the EE, EE "just turned and knee gave out". EE stated that this was a "preexisting injury that EE thought was healed". EE finished EE's shift and did not seek medical attention until 3/12/2026. EE was later caught walking through the location while on EE's cell phone and EE was walking without issue.
Berms or guardrails.
Pyramid Quarry · 360897730 CFR 56.9300(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Securing gas cylinders.
Pyramid Quarry · 360897730 CFR 56.16005 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.