GREENBRIER SMOKELESS COAL MINING, LLC. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
103 (g) Written Notification Hazard Complaint Inspectio
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917213.5 on-site hours reported
Other safeguards.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.1403
Accumulation of combustible materials.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.400 · $267.00 proposed penalty
Mine emergency evacuation training and drills.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.1504(c) · $697.00 proposed penalty
Maintenance of incombustible content of rock dust.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.403 · $151.00 proposed penalty
Roof control plan.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.220(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.512 · Significant and substantial (S&S) · $883.00 proposed penalty
Underground electrical installations.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.340(a)(1)(i) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.370(a)(1) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 72.630(b) · $151.00 proposed penalty
Preshift examination at fixed intervals.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.360(b)(1) · $151.00 proposed penalty
Ventilation controls.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.370(a)(1) · $151.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.1107-4(c) · $151.00 proposed penalty
Proximity detection systems.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $883.00 proposed penalty
Guarding of cables.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.816(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.400 · $267.00 proposed penalty
Electric equipment; examination, testing and maintenance.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.512 · $151.00 proposed penalty
Accumulation of combustible materials.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.400 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.370(a)(1) · $151.00 proposed penalty
Mining methods.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.203(e)(2) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.370(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.370(a)(1)
Mine ventilation plan; submission and approval.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.370(a)(1) · $184.00 proposed penalty
Accumulation of combustible materials.
MOUNTAINEER POCAHONTAS NO 1 MINE · 460917230 CFR 75.400 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.