NO. 4 MINE · 300224530 CFR 57.14100(a) · Significant and substantial (S&S)
Escape routes.
NO. 4 MINE · 300224530 CFR 57.11051(b)
Provision and maintenance of self-rescue devices.
NO. 4 MINE · 300224530 CFR 57.15030
Brakes.
NO. 4 MINE · 300224530 CFR 57.14101(a)(2)
Safety defects; examination, correction and records.
NO. 4 MINE · 300224530 CFR 57.14100(c) · Significant and substantial (S&S)
Two-way communication equipment for underground operations.
NO. 4 MINE · 300224530 CFR 57.20032
Regular Safety and Health Inspection
NO. 4 MINE · 300224522.8 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
NO. 4 MINE · 30022455.5 on-site hours reported
Electrical conductors.
BALMAT MINING OPERATIONS · 300061030 CFR 56.12004 · $151.00 proposed penalty
Closure of valves.
BALMAT MINING OPERATIONS · 300061030 CFR 56.4603(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
BALMAT MINING OPERATIONS · 300061015.3 on-site hours reported
General instructions for completing MSHA Form 7000-1.
BALMAT MINING OPERATIONS · 300061030 CFR 50.20-1 · $151.00 proposed penalty
Spot Inspection
NO. 4 MINE · 300224512.5 on-site hours reported
Compliance Follow-up Inspection
NO. 4 MINE · 30022451.5 on-site hours reported
Two-way communication equipment for underground operations.
NO. 4 MINE · 300224530 CFR 57.20032 · $151.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
NO. 4 MINE · 30022458.3 on-site hours reported
Regular Safety and Health Inspection
NO. 4 MINE · 30022459.8 on-site hours reported
Regular Safety and Health Inspection
NO. 4 MINE · 300224526.0 on-site hours reported
Safe access.
BALMAT MINING OPERATIONS · 300061030 CFR 56.11001 · Significant and substantial (S&S) · $193.00 proposed penalty
Regular Safety and Health Inspection
BALMAT MINING OPERATIONS · 300061010.0 on-site hours reported
Slip or fall of person
BALMAT MINING OPERATIONS · 3000610Days away from work only
Accident narrative
Had some water from melting snow that had leaked on this inside and employee had slipped.
Horns and backup alarms for surface equipment.
NO. 4 MINE · 300224530 CFR 57.14132(a) · $165.00 proposed penalty
Regular Safety and Health Inspection
NO. 4 MINE · 300224523.0 on-site hours reported
Escape and evacuation plans.
NO. 4 MINE · 300224530 CFR 57.11053(c) · $151.00 proposed penalty
Escape and evacuation plans.
NO. 4 MINE · 300224530 CFR 57.11053(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.