GLENN LEGE CONSTRUCTION safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
LA 82 / Verot Pit · 16016190.0 on-site hours reported
Records of training.
LA 82 / Verot Pit · 160161930 CFR 46.9(c)(3)
General requirements.
LA 82 / Verot Pit · 160161930 CFR 56.4200(b)(1)
Requirement for container labels.
LA 82 / Verot Pit · 160161930 CFR 47.41(a)
Horns and backup alarms.
LA 82 / Verot Pit · 160161930 CFR 56.14132(a)
Securing movable parts.
LA 82 / Verot Pit · 160161930 CFR 56.14206(b)
Identification of power switches.
LA 82 / Verot Pit · 160161930 CFR 56.12018
Regular Safety and Health Inspection
LA 82 / Verot Pit · 16016195.0 on-site hours reported
Notification by operator.
LA 82 / Verot Pit · 160161930 CFR 41.11(a) · $151.00 proposed penalty
Requirement for container labels.
LA 82 / Verot Pit · 160161930 CFR 47.41(a) · $151.00 proposed penalty
Compliance Follow-up Inspection
LA 82 / Verot Pit · 16016191.0 on-site hours reported
Regular Safety and Health Inspection
LA 82 / Verot Pit · 16016196.0 on-site hours reported
Safety defects; examination, correction and records.
LA 82 / Verot Pit · 160161930 CFR 56.14100(b) · $151.00 proposed penalty
Inspection.
LA 82 / Verot Pit · 160161930 CFR 56.4201(a)(1) · $151.00 proposed penalty
Moving machine parts.
LA 82 / Verot Pit · 160161930 CFR 56.14107(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
LA 82 / Verot Pit · 160161930 CFR 56.14130(g) · $151.00 proposed penalty
Compliance Follow-up Inspection
LA 82 / Verot Pit · 160161910.0 on-site hours reported
Spot Inspection
LA 82 / Verot Pit · 160161913.5 on-site hours reported
Regular Safety and Health Inspection
LA 82 / Verot Pit · 16016199.5 on-site hours reported
Examination of working places.
LA 82 / Verot Pit · 160161930 CFR 56.18002(a) · Significant and substantial (S&S) · $366.00 proposed penalty
First-aid materials.
LA 82 / Verot Pit · 160161930 CFR 56.15001 · $151.00 proposed penalty
Testing grounding systems.
LA 82 / Verot Pit · 160161930 CFR 56.12028 · $151.00 proposed penalty
Independent contractor register.
LA 82 / Verot Pit · 160161930 CFR 45.4(b) · $151.00 proposed penalty
Identification of power switches.
LA 82 / Verot Pit · 160161930 CFR 56.12018 · $151.00 proposed penalty
Safety can use.
LA 82 / Verot Pit · 160161930 CFR 56.4402 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.