← GCC Rio Grande Inc

GCC Rio Grande Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Correction of dangerous conditions.

    violationRecord 9799924
    Tijeras Plant & Quarry · 2900013

    30 CFR 56.12030 · $226.00 proposed penalty

  2. Inspection.

    violationRecord 9799923
    Tijeras Plant & Quarry · 2900013

    30 CFR 56.4201(a)(2) · $288.00 proposed penalty

  3. Pit or quarry wall perimeter.

    violationRecord 9799922
    Tijeras Plant & Quarry · 2900013

    30 CFR 56.3131 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  4. Wall, bank, and slope stability.

    violationRecord 9799921
    Tijeras Plant & Quarry · 2900013

    30 CFR 56.3130 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  5. Safety defects; examination, correction and records.

    violationRecord 9799920
    Tijeras Plant & Quarry · 2900013

    30 CFR 56.14100(d) · $398.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F01716A
    Tijeras Plant & Quarry · 2900013

    30.8 on-site hours reported

  7. Records of training.

    violationRecord 9799919
    Tijeras Plant & Quarry · 2900013

    30 CFR 46.9 · $151.00 proposed penalty

  8. Machinery, equipment, and tools.

    violationRecord 9799918
    Tijeras Plant & Quarry · 2900013

    30 CFR 56.14205 · $151.00 proposed penalty

  9. Brakes.

    violationRecord 9799917
    Tijeras Plant & Quarry · 2900013

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  10. Horns and backup alarms.

    violationRecord 9799916
    Tijeras Plant & Quarry · 2900013

    30 CFR 56.14132(a) · $151.00 proposed penalty

  11. Verbal Hazard Complaint Inspections

    inspectionRecord F017169
    Tijeras Plant & Quarry · 2900013

    12.5 on-site hours reported

  12. Compliance Follow-up Inspection

    inspectionRecord F015E40
    Tijeras Plant & Quarry · 2900013

    0.5 on-site hours reported

  13. Handling of materials

    accidentRecord 220250940006
    Pueblo Plant & Quarry · 0504822

    Days restricted activity only

    Accident narrative

    Employee was torqueing studs at Finish Mill. Employee dropped nut on foot.

  14. Spot Inspection

    inspectionRecord F015E3C
    Tijeras Plant & Quarry · 2900013

    10.8 on-site hours reported

  15. Entrapment

    accidentRecord 220250660011
    Tijeras Plant & Quarry · 2900013

    Accident only

    Accident narrative

    Mill Manlift gearbox broke. Miner was entrapped in manlift for 38 minutes. Miner egressed out emergency exit of manlift roof.

  16. Spot Inspection

    inspectionRecord F015E22
    Tijeras Plant & Quarry · 2900013

    1.5 on-site hours reported

  17. Exposure limits for airborne contaminants.

    violationRecord 9797074
    Tijeras Plant & Quarry · 2900013

    30 CFR 56.5001(a)/56.5005 · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.