GCC Rio Grande Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Handling of materials
Pueblo Plant & Quarry · 0504822Dys awy frm wrk & restrctd act
Accident narrative
Employee was pushing forks together on a telehandler when EE felt a pain in EE's left bicep.
Spot Inspection
Pueblo Plant & Quarry · 05048220.0 on-site hours reported
Site-specific hazard awareness training.
Pueblo Plant & Quarry · 050482230 CFR 46.11(d) · Significant and substantial (S&S) · $714.00 proposed penalty
Safety defects; examination, correction and records.
Pueblo Plant & Quarry · 050482230 CFR 56.14100(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Brakes.
Pueblo Plant & Quarry · 050482230 CFR 56.14101(a)(3) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Illumination of surface working areas.
Pueblo Plant & Quarry · 050482230 CFR 56.17001 · $151.00 proposed penalty
Examination of working places.
Pueblo Plant & Quarry · 050482230 CFR 56.18002(b) · $151.00 proposed penalty
Housekeeping.
Pueblo Plant & Quarry · 050482230 CFR 56.20003(a) · $245.00 proposed penalty
Testing grounding systems.
Pueblo Plant & Quarry · 050482230 CFR 56.12028 · $592.00 proposed penalty
Testing grounding systems.
Pueblo Plant & Quarry · 050482230 CFR 56.12028 · $592.00 proposed penalty
Illumination of surface working areas.
Pueblo Plant & Quarry · 050482230 CFR 56.17001 · $151.00 proposed penalty
Illumination of surface working areas.
Pueblo Plant & Quarry · 050482230 CFR 56.17001 · $151.00 proposed penalty
Powered haulage
Pueblo Plant & Quarry · 0504822Fatality
Accident narrative
A delivery driver employed by a water supply vendor was in route to the facility when the tanker truck overturned and slid off the road. Investigation ongoing
Fatal Accident Investigation
Pueblo Plant & Quarry · 050482262.3 on-site hours reported
Violation — cited standard not reported
Pueblo Plant & Quarry · 0504822Housekeeping.
Pueblo Plant & Quarry · 050482230 CFR 56.20003(a) · $151.00 proposed penalty
Safe access.
Pueblo Plant & Quarry · 050482230 CFR 56.11001 · $151.00 proposed penalty
Inspection.
Pueblo Plant & Quarry · 050482230 CFR 56.4201(a)(2) · $151.00 proposed penalty
Testing grounding systems.
Pueblo Plant & Quarry · 050482230 CFR 56.12028 · $755.00 proposed penalty
Inspection.
Pueblo Plant & Quarry · 050482230 CFR 56.4201(b) · $151.00 proposed penalty
Inspection.
Pueblo Plant & Quarry · 050482230 CFR 56.4201(b) · $151.00 proposed penalty
Barricades and warning signs.
Pueblo Plant & Quarry · 050482230 CFR 56.20011 · Significant and substantial (S&S) · $883.00 proposed penalty
Electrical conductors.
Pueblo Plant & Quarry · 050482230 CFR 56.12004 · $592.00 proposed penalty
Requirement for container labels.
Pueblo Plant & Quarry · 050482230 CFR 47.41(a)(1) · $267.00 proposed penalty
Testing grounding systems.
Pueblo Plant & Quarry · 050482230 CFR 56.12028 · $642.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.