GCC Rio Grande Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Handtools (nonpowered)
Pueblo Plant & Quarry · 0504822Days away from work only
Accident narrative
Miner was cleaning the tower using a bar and a sledgehammer. Miner hit the bar with a hammer; a piece of metal broke off and flew into the miner's eye.
Handling of materials
Pueblo Plant & Quarry · 0504822Days restricted activity only
Accident narrative
Miner was shoveling rock into buckets at the tail end of the limestone tunnel and hauling the buckets outside the tunnel to dump. Miner hurt their lower back in the process.
Requirement for container labels.
Pueblo Plant & Quarry · 050482230 CFR 47.41(a) · $151.00 proposed penalty
Moving machine parts.
Pueblo Plant & Quarry · 050482230 CFR 56.14107(a) · $151.00 proposed penalty
Construction and maintenance of ladders.
Pueblo Plant & Quarry · 050482230 CFR 56.11003 · Significant and substantial (S&S) · $151.00 proposed penalty
Construction and maintenance of ladders.
Pueblo Plant & Quarry · 050482230 CFR 56.11003 · $151.00 proposed penalty
Records of training.
Pueblo Plant & Quarry · 050482230 CFR 46.9(d)(3) · $151.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
Pueblo Plant & Quarry · 050482230 CFR 50.20(a) · $151.00 proposed penalty
Inspection.
Pueblo Plant & Quarry · 050482230 CFR 56.4201(a)(2) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Pueblo Plant & Quarry · 050482230 CFR 56.12008 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Pueblo Plant & Quarry · 050482230 CFR 56.12008 · $151.00 proposed penalty
Horns and backup alarms.
Pueblo Plant & Quarry · 050482230 CFR 56.14132(a) · $151.00 proposed penalty
Inspection.
Pueblo Plant & Quarry · 050482230 CFR 56.4201(a)(2) · $226.00 proposed penalty
Housekeeping.
Pueblo Plant & Quarry · 050482230 CFR 56.20003(a) · $313.00 proposed penalty
Housekeeping.
Pueblo Plant & Quarry · 050482230 CFR 56.20003(a) · $313.00 proposed penalty
Construction and maintenance of guards.
Pueblo Plant & Quarry · 050482230 CFR 56.14112(b) · $226.00 proposed penalty
Construction and maintenance of guards.
Pueblo Plant & Quarry · 050482230 CFR 56.14112(b) · $226.00 proposed penalty
Electrical conductors.
Pueblo Plant & Quarry · 050482230 CFR 56.12004 · $151.00 proposed penalty
Fixed ladder anchorage and toe clearance.
Pueblo Plant & Quarry · 050482230 CFR 56.11005 · $151.00 proposed penalty
Securing gas cylinders.
Pueblo Plant & Quarry · 050482230 CFR 56.16005 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Pueblo Plant & Quarry · 050482230 CFR 56.14100(b) · $177.00 proposed penalty
Parking procedures for unattended equipment.
Pueblo Plant & Quarry · 050482230 CFR 56.14207 · $151.00 proposed penalty
Requirement for container labels.
Pueblo Plant & Quarry · 050482230 CFR 47.41(a) · $177.00 proposed penalty
Inspection.
Pueblo Plant & Quarry · 050482230 CFR 56.4201(a)(2) · $177.00 proposed penalty
Compliance Follow-up Inspection
Tijeras Plant & Quarry · 29000132.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.