GCC Energy LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
King II · 050486430 CFR 75.1600-2(e)
Maintenance of belt conveyors and belt conveyor entries.
King II · 050486430 CFR 75.1731(a)
Type and quality of firefighting equipment.
King II · 050486430 CFR 75.1100-1(a)
Identification check system.
King II · 050486430 CFR 75.1715
Regular Safety and Health Inspection
King II · 05048640.0 on-site hours reported
Handling of materials
King II · 0504864No dys awy frm wrk,no rstr act
Accident narrative
Employee was loading crib into a transportation vehicle. They did not fully release the crib when they were loading it. The crib hit their finger against the frame of the vehicle causing laceration. Employee was taken to medicine clinic and received 3 stitches.
Requirement for container labels.
King II · 050486430 CFR 47.41(a)
Permissible electric face equipment; maintenance.
King II · 050486430 CFR 75.503
Protection from falls of roof, face and ribs.
King II · 050486430 CFR 75.202(a) · Significant and substantial (S&S)
Condition and examination of firefighting equipment.
King II · 050486430 CFR 75.1100-3
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
King II · 050486430 CFR 75.1600-2(e)
Ventilation controls.
King II · 050486430 CFR 75.333(h) · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
King II · 050486430 CFR 75.370(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
King II · 050486430 CFR 75.512 · $151.00 proposed penalty
Ventilation controls.
King II · 050486430 CFR 75.333(h) · $151.00 proposed penalty
Regular Safety and Health Inspection
King II · 0504864160.8 on-site hours reported
Equipment and maintenance requirements.
King II · 050486430 CFR 49.16(b)(1) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
King II · 050486430 CFR 77.410(c) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
King II · 050486430 CFR 75.1725(c) · $151.00 proposed penalty
Operation of diesel-powered equipment.
King II · 050486430 CFR 75.1916(e) · $151.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
King II · 050486430 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Escapeway maps.
King II · 050486430 CFR 75.1505(b) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
King II · 050486430 CFR 75.1731(b) · $193.00 proposed penalty
Ventilation controls.
King II · 050486430 CFR 75.333(b)(3) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
King II · 050486430 CFR 75.403 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.