← GCC Dacotah Inc

GCC Dacotah Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inspection.

    violationRecord 5054420
    GCC Dacotah Inc · 3900022

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  2. Parking procedures for unattended equipment.

    violationRecord 5054419
    GCC Dacotah Inc · 3900022

    30 CFR 56.14207 · $177.00 proposed penalty

  3. Electrical conductors.

    violationRecord 5054418
    GCC Dacotah Inc · 3900022

    30 CFR 56.12004 · $398.00 proposed penalty

  4. Barricades and warning signs.

    violationRecord 5054417
    GCC Dacotah Inc · 3900022

    30 CFR 56.20011 · Significant and substantial (S&S) · $592.00 proposed penalty

  5. Construction and maintenance of guards.

    violationRecord 5054416
    GCC Dacotah Inc · 3900022

    30 CFR 56.14112(a)(2) · $151.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F01486D
    GCC Dacotah Inc · 3900022

    116.3 on-site hours reported

  7. Safe access.

    violationRecord 5054927
    GCC Dacotah Inc · 3900022

    30 CFR 56.11001 · $959.00 proposed penalty

  8. Spillage and leakage.

    violationRecord 5054926
    GCC Dacotah Inc · 3900022

    30 CFR 56.4102 · $592.00 proposed penalty

  9. Testing grounding systems.

    violationRecord 5054925
    GCC Dacotah Inc · 3900022

    30 CFR 56.12028 · $398.00 proposed penalty

  10. Combustible waste.

    violationRecord 5054415
    GCC Dacotah Inc · 3900022

    30 CFR 56.4104(b) · $151.00 proposed penalty

  11. Protection for openings around travelways.

    violationRecord 5054414
    GCC Dacotah Inc · 3900022

    30 CFR 56.11012 · $151.00 proposed penalty

  12. Warning signs.

    violationRecord 5054413
    GCC Dacotah Inc · 3900022

    30 CFR 56.4101 · $151.00 proposed penalty

  13. Inspection.

    violationRecord 5054412
    GCC Dacotah Inc · 3900022

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  14. Safety belts and lines.

    violationRecord 5054411
    GCC Dacotah Inc · 3900022

    30 CFR 56.15005 · Significant and substantial (S&S) · $432.00 proposed penalty

  15. Verbal Hazard Complaint Inspections

    inspectionRecord F024215
    GCC Dacotah Inc · 3900022

    2.0 on-site hours reported

  16. Handling of materials

    accidentRecord 220253300007
    GCC Dacotah Inc · 3900022

    Days restricted activity only

    Accident narrative

    The employee was assisting in installing a new drop pipe. The pipe remained secured but shifted from its placement, and the employee on the ground had a hold of it to keep it from swinging and felt the impact of the pipe shifting and felt discomfort in EE's back.

  17. Fire

    accidentRecord 220253240001
    GCC Dacotah Inc · 3900022

    Accident only

    Accident narrative

    Lost the kiln mcc and lost power to kiln draft, and the atox feed belt caught fire. Fire was controlled in about 15 minutes.

  18. Spot Inspection

    inspectionRecord 6941571
    GCC Dacotah Inc · 3900022

    0.8 on-site hours reported

  19. Handling of materials

    accidentRecord 220253170351
    GCC Dacotah Inc · 3900022

    No dys awy frm wrk,no rstr act

    Accident narrative

    The employee was moving thin sheets of metal (not wearing the appropriate PPE, cut-proof gloves) and cut EE's finger, resulting in five stitches.

  20. Handling of materials

    accidentRecord 220253170344
    GCC Dacotah Inc · 3900022

    Days away from work only

    Accident narrative

    The employee was bent down picking up extra bolts when they felt a pop in their knee as they stood up. It was determined that the employee tore their meniscus and needed surgery.

  21. Handtools (nonpowered)

    accidentRecord 220253170170
    GCC Dacotah Inc · 3900022

    Days restricted activity only

    Accident narrative

    Miner was replacing rear belt skirting. After removing the old skirting, the miner used it to trace and cut a new piece. As the affected miner was starting to cut the new piece, the knife slipped and embedded itself about an inch into their leg. The miner was taken to urgent care, where they received four stitches just above the knee.

  22. Slip or fall of person

    accidentRecord 220253170169
    GCC Dacotah Inc · 3900022

    Days restricted activity only

    Accident narrative

    Miner was called in to repair the splice in a belt. After completing the repair and reassembling the equipment, the miner checked the belt's operation. While inspecting the belt, the miner accidentally stepped on some clinker on the ground, causing them to slip and hyperextend their knee.

  23. Written safety program.

    violationRecord 5054327
    GCC Dacotah Inc · 3900022

    30 CFR 56.23002(a) · $151.00 proposed penalty

  24. Regular Safety and Health Inspection

    inspectionRecord F0150DB
    KONECHNE MINE · 3901617

    6.3 on-site hours reported

  25. Written safety program.

    violationRecord 5054326
    GCC Dacotah Inc · 3900022

    30 CFR 56.23002(a) · $165.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.