Frontier Coal Company safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Machinery
BELCHER BRANCH · 4609474No dys awy frm wrk,no rstr act
Accident narrative
While using a drill with a wire wheel, EE was cleaning off a flanged surface. Unknowingly EE left a thin metal shim on one of the surfaces. When the wire wheel made contact with the shim. It spun it around at high speed resulting in cuts to EE's right hand.
Spot Inspection
BELCHER BRANCH · 46094741.5 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
BELCHER BRANCH · 46094743.5 on-site hours reported
Spot Inspection
BELCHER BRANCH · 46094741.0 on-site hours reported
Temporary notations, revisions, and supplements.
BELCHER BRANCH · 460947430 CFR 75.1202-1(b)(3) · $151.00 proposed penalty
Spot Inspections
BELCHER BRANCH · 4609474103(i) · 6.5 on-site hours reported
Spot Inspections
BELCHER BRANCH · 4609474103(i) · 4.8 on-site hours reported
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
BELCHER BRANCH · 460947430 CFR 75.1600-2(e) · $245.00 proposed penalty
Short circuit protection of trailing cables.
BELCHER BRANCH · 460947430 CFR 75.601 · $818.00 proposed penalty
Cable fittings; suitability.
BELCHER BRANCH · 460947430 CFR 77.505 · $245.00 proposed penalty
Mine ventilation plan; submission and approval.
BELCHER BRANCH · 460947430 CFR 75.370(a)(1)
Spot Inspections
BELCHER BRANCH · 4609474103(i) · 7.5 on-site hours reported
Status change reports.
BELCHER BRANCH · 460947430 CFR 70.212(a) · $151.00 proposed penalty
Spot Inspections
BELCHER BRANCH · 4609474103(i) · 1.8 on-site hours reported
Escapeway maps.
BELCHER BRANCH · 460947430 CFR 75.1505(b) · $755.00 proposed penalty
Identification of circuit breakers.
BELCHER BRANCH · 460947430 CFR 75.904 · $755.00 proposed penalty
Rock dusting.
BELCHER BRANCH · 460947430 CFR 75.402 · $549.00 proposed penalty
Mine ventilation plan; submission and approval.
BELCHER BRANCH · 460947430 CFR 75.370(a)(1) · $714.00 proposed penalty
Conventional roof support.
BELCHER BRANCH · 460947430 CFR 75.206(e) · $1,818.00 proposed penalty
On-shift examination.
BELCHER BRANCH · 460947430 CFR 75.362(d)(1)(iii) · $818.00 proposed penalty
Roof control plan.
BELCHER BRANCH · 460947430 CFR 75.220(a)(1) · $5,574.00 proposed penalty
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Mine map.
BELCHER BRANCH · 460947430 CFR 75.1200(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
BELCHER BRANCH · 460947430 CFR 75.370(a)(1)
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a)
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.