Ferroglobe USA Quartz, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Handling of materials
Marlboro Mine · 3800768Days away from work only
Accident narrative
Excavator operator noticed that the a "pay" conveyor belt at the plant was overloaded and de-energized it. EE reported the situation and was told that it would have to be shoveled off and help would be there shortly. EE was shoveling from EE's knees and when EE got to EE's feet EE felt pain in EE's knee.
Regular Safety and Health Inspection
Meadows · 01035177.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Meadows · 010351730 CFR 50.30(a) · $151.00 proposed penalty
Housekeeping.
Meadows · 010351730 CFR 56.20003(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Horns and backup alarms.
Meadows · 010351730 CFR 56.14132(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
Marlboro Mine · 38007683.8 on-site hours reported
Compliance Follow-up Inspection
Marlboro Mine · 38007681.3 on-site hours reported
Securing gas cylinders.
Marlboro Mine · 380076830 CFR 56.16005 · $267.00 proposed penalty
Examination of working places.
Marlboro Mine · 380076830 CFR 56.18002(b) · $151.00 proposed penalty
Horns and backup alarms.
Marlboro Mine · 380076830 CFR 56.14132(a) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Marlboro Mine · 380076830 CFR 56.14100(b) · $883.00 proposed penalty
Brakes.
Marlboro Mine · 380076830 CFR 56.14101(a)(2) · $883.00 proposed penalty
Horns and backup alarms.
Marlboro Mine · 380076830 CFR 56.14132(b)(1)(i) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Marlboro Mine · 380076830 CFR 56.14100(b) · $267.00 proposed penalty
Verbal Hazard Complaint Inspections
Marlboro Mine · 38007687.8 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
Marlboro Mine · 38007681.0 on-site hours reported
Regular Safety and Health Inspection
Marlboro Mine · 38007684.8 on-site hours reported
New task training.
Marlboro Mine · 380076830 CFR 46.7(a) · $267.00 proposed penalty
Safety can use.
Marlboro Mine · 380076830 CFR 56.4402 · $151.00 proposed penalty
Inspection.
Marlboro Mine · 380076830 CFR 56.4201(a)(2) · $267.00 proposed penalty
Safety defects; examination, correction and records.
Marlboro Mine · 380076830 CFR 56.14100(a) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Marlboro Mine · 380076830 CFR 56.14100(b) · $883.00 proposed penalty
Eye protection.
Marlboro Mine · 380076830 CFR 56.15004 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Regular Safety and Health Inspection
Marlboro Mine · 38007688.5 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Marlboro Mine · 380076830 CFR 50.30(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.