Excel Mining safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Power wires and cables; insulation and protection.
Excel #5 · 151983830 CFR 75.517 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
Excel #5 · 151983830 CFR 75.403 · $755.00 proposed penalty
Maintenance of incombustible content of rock dust.
Excel #5 · 151983830 CFR 75.403 · $755.00 proposed penalty
Maintenance of incombustible content of rock dust.
Excel #5 · 151983830 CFR 75.403 · $755.00 proposed penalty
Maintenance of incombustible content of rock dust.
Excel #5 · 151983830 CFR 75.403 · $755.00 proposed penalty
Maintenance of incombustible content of rock dust.
Excel #5 · 151983830 CFR 75.403 · $755.00 proposed penalty
Installation of high-voltage transmission cables.
Excel #5 · 151983830 CFR 75.807 · $165.00 proposed penalty
Violation — cited standard not reported
Excel #5 · 1519838$168.00 proposed penalty
Spot Inspections
Excel #5 · 1519838103(i) · 5.0 on-site hours reported
Maintenance of incombustible content of rock dust.
Excel #5 · 151983830 CFR 75.403 · $1,818.00 proposed penalty
Maintenance of incombustible content of rock dust.
Excel #5 · 151983830 CFR 75.403 · $4,047.00 proposed penalty
Maintenance of incombustible content of rock dust.
Excel #5 · 151983830 CFR 75.403 · $1,037.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
Excel #5 · 151983830 CFR 75.1103-8(c) · $818.00 proposed penalty
Disconnecting devices.
Excel #5 · 151983830 CFR 75.903 · $209.00 proposed penalty
Machinery
Excel #5 · 1519838Dys awy frm wrk & restrctd act
Accident narrative
Employee was starting to drill the outside hole. When the steel touched the roof, the bit broke and the up pressure caused the drill steel to bend in 2 places. EE hit the rotation causing the steel to spin around and strike EE's right thumb causing a fracture.
Spot Inspections
Excel #5 · 1519838103(i) · 11.5 on-site hours reported
Belt air course ventilation.
Excel #5 · 151983830 CFR 75.350(a)(2) · $209.00 proposed penalty
Power wires and cables; insulation and protection.
Excel #5 · 151983830 CFR 75.517 · $151.00 proposed penalty
Spot Inspections
Excel #5 · 1519838103(i) · 5.0 on-site hours reported
Automatic emergency-parking brakes.
Excel #5 · 151983830 CFR 75.523-3(b)(1) · Significant and substantial (S&S) · $465.00 proposed penalty
Accumulation of combustible materials.
Excel #5 · 151983830 CFR 75.400 · $336.00 proposed penalty
Permissible electric face equipment; maintenance.
Excel #5 · 151983830 CFR 75.503 · $336.00 proposed penalty
Spot Inspections
Excel #5 · 1519838103(i) · 4.0 on-site hours reported
Accumulation of combustible materials.
Excel #5 · 151983830 CFR 75.400 · $336.00 proposed penalty
Accumulation of combustible materials.
Excel #5 · 151983830 CFR 75.400 · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.