← Excel Mining

Excel Mining safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 9880162
    Excel #5 · 1519838

    30 CFR 75.370(a)(1) · $549.00 proposed penalty

  2. Belt air course ventilation.

    violationRecord 9880161
    Excel #5 · 1519838

    30 CFR 75.350(a)(2) · $336.00 proposed penalty

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 9880160
    Excel #5 · 1519838

    30 CFR 75.512 · $755.00 proposed penalty

  4. Other safeguards.

    violationRecord 9880159
    Excel #5 · 1519838

    30 CFR 75.1403

  5. Other safeguards.

    violationRecord 9880158
    Excel #5 · 1519838

    30 CFR 75.1403 · Significant and substantial (S&S) · $818.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 9880157
    Excel #5 · 1519838

    30 CFR 75.400 · $366.00 proposed penalty

  7. Drill dust control at underground areas of underground mines.

    violationRecord 9880156
    Excel #5 · 1519838

    30 CFR 72.630(b) · $336.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 9880155
    Excel #5 · 1519838

    30 CFR 75.517 · $398.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 8309275
    Excel #5 · 1519838

    30 CFR 75.400 · $336.00 proposed penalty

  10. Spot Inspections

    inspectionRecord 4411756
    Excel #5 · 1519838

    103(i) · 5.0 on-site hours reported

  11. Maintenance of incombustible content of rock dust.

    violationRecord 9880154
    Excel #5 · 1519838

    30 CFR 75.403 · $432.00 proposed penalty

  12. Maintenance of incombustible content of rock dust.

    violationRecord 9880153
    Excel #5 · 1519838

    30 CFR 75.403 · $1,679.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F004FE8
    Excel #5 · 1519838

    103(i) · 5.0 on-site hours reported

  14. Inspection of fire suppression devices.

    violationRecord 9880146
    Excel #5 · 1519838

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  15. Power wires and cables; insulation and protection.

    violationRecord 9880145
    Excel #5 · 1519838

    30 CFR 75.517 · Significant and substantial (S&S) · $4,383.00 proposed penalty

  16. Escapeways; bituminous and lignite mines.

    violationRecord 9880144
    Excel #5 · 1519838

    30 CFR 75.380(d)(7)(vi) · $313.00 proposed penalty

  17. Preshift examination at fixed intervals.

    violationRecord 9880143
    Excel #5 · 1519838

    30 CFR 75.360(g) · $151.00 proposed penalty

  18. Quantity and location of firefighting equipment.

    violationRecord 9880142
    Excel #5 · 1519838

    30 CFR 75.1100-2(e) · $1,037.00 proposed penalty

  19. Belt air course ventilation.

    violationRecord 8309274
    Excel #5 · 1519838

    30 CFR 75.350(a)(2) · $151.00 proposed penalty

  20. Methane monitors.

    violationRecord 9880141
    Excel #5 · 1519838

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  21. Preshift examination at fixed intervals.

    violationRecord 9880140
    Excel #5 · 1519838

    30 CFR 75.360(g) · $226.00 proposed penalty

  22. Spot Inspections

    inspectionRecord 4411755
    Excel #5 · 1519838

    103(i) · 5.0 on-site hours reported

  23. Mine ventilation plan; submission and approval.

    violationRecord 8309271
    Excel #5 · 1519838

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 9880137
    Excel #5 · 1519838

    30 CFR 75.400 · $366.00 proposed penalty

  25. Installation of high-voltage transmission cables.

    violationRecord 9880136
    Excel #5 · 1519838

    30 CFR 75.807 · $697.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.