Coal production
2,691,305reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| El Segundo2902257 · Active6/8 quarters reported | Mckinley, NMSurface · MSHA: Coal (Bituminous) | 440,329 | 128,736 | 5 | 1 | 64.0 |
| Lee Ranch Coal Mine2901879 · Active6/8 quarters reported | Mckinley, NMSurface · MSHA: Coal (Bituminous) | 2,250,976 | 391,472 | 8 | 5 | 187.3 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 2 mines listed under this operator were checked; 2 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 513,484 | 92,999 | 5.52 | 188 | 2/2 mines reporting |
| 2025 Q2 | 436,441 | 89,928 | 4.85 | 181 | 2/2 mines reporting |
| 2025 Q3 | 440,935 | 86,890 | 5.07 | 176 | 2/2 mines reporting |
| 2025 Q4 | 444,394 | 83,493 | 5.32 | 178 | 2/2 mines reporting |
| 2026 Q1 | 415,722 | 85,721 | 4.85 | 176 | 2/2 mines reporting |
| 2026 Q2 | 440,329 | 81,177 | 5.42 | 169 | 2/2 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
2 significant & substantial (S&S)
0 records classified as fatality
13 of 13 violations with amounts
13 inspections · 13 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 2 | 2 | 3,187.00 | 0 | 0 | 2 | 16.0 |
| 2025-Q2 | 1 | 0 | 151.00 | 1 | 0 | 3 | 65.0 |
| 2025-Q3 | 0 | 0 | — | 3 | 0 | 2 | 28.0 |
| 2025-Q4 | 0 | 0 | — | 0 | 0 | 1 | 14.0 |
| 2026-Q1 | 6 | 0 | 4,560.00 | 1 | 0 | 2 | 59.8 |
| 2026-Q2 | 2 | 0 | 302.00 | 1 | 0 | 1 | 23.5 |
| 2026-Q3 | 2 | 0 | 302.00 | 0 | 0 | 2 | 45.0 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
41.20 · $151.00 proposed
Compliance Follow-up Inspection · 12.0 on-site hours
77.410(c) · $151.00 proposed
Regular Safety and Health Inspection · 33.0 on-site hours
77.1713(c) · $151.00 proposed
77.1109(c)(1) · $151.00 proposed
Regular Safety and Health Inspection · 23.5 on-site hours
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
The injured employee was assisting with dragging a scrap truck frame when EE reached under the front bumper area to guide the Dyneema rope. A sharp metal shard protruding from the underside of the bumper contacted EE's right forearm.
77.502 · $226.00 proposed
47.41(a) · $151.00 proposed
Regular Safety and Health Inspection · 39.8 on-site hours
77.502-2 · $3,448.00 proposed
77.1607(n) · $245.00 proposed
77.208(d) · $245.00 proposed
77.1110 · $245.00 proposed
Regular Safety and Health Inspection · 20.0 on-site hours
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Employee was carrying a box of detonators while distributing them on blast pattern when they stepped into a low spot in the ground, employee felt discomfort in their abdomen. Employee was diagnosed with a hernia on 1-29-2026 making this a reportable incident.
Compliance Follow-up Inspection · 14.0 on-site hours
Compliance Follow-up Inspection · 15.0 on-site hours
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
IE slipped in mud as they tried to catch themselves with right leg they felt a pop in upper leg.
HANDTOOLS (NONPOWERED) · DAYS AWAY FROM WORK ONLY
Tool slipped and employee fell to a lower surface injuring the right elbow.
SLIP OR FALL OF PERSON · DYS AWY FRM WRK & RESTRCTD ACT
Employee misjudged step on boarding ladder. Held on to handrail with right arm so they wouldn't fall to the ground.
Compliance Follow-up Inspection · 13.0 on-site hours
Compliance Follow-up Inspection · 12.0 on-site hours
HANDLING OF MATERIALS · DYS AWY FRM WRK & RESTRCTD ACT
On 06/12/2025 employee reported that a coworker kicked the back of the front seat from the back seat of a quad cab pickup on 06/11/2025. On August 4th the employee was treated at an urgent care facility and released with restrictions.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 328,621 | 9,383 | 0.70 | 17.04 | 67.31 | |
| 2025-Q4 | 328,676 | 9,265 | 0.69 | 17.72 | 66.88 | |
| 2026-Q1 | 375,591 | 9,424 | 0.76 | 16.54 | 68.97 | |
| 2026-Q2 | 266,211 | 9,509 | 0.75 | 14.91 | 70.14 | |
| 2026-Q3 * | 156,681 | 9,620 | 0.86 | 12.60 | 75.63 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 12496 · preliminary | EL SEGUNDO2902257 | Springerville8223 · AZ · PEABODY COAL SALES | 156,681 | 75.63 | 9,620 | 0.86 | 12.60 | ContractSUB | Rail |
| 2026-06EIA row 10549 · preliminary | EL SEGUNDO2902257 | Springerville8223 · AZ · PEABODY COAL SALES | 172,325 | 70.25 | 9,535 | 0.84 | 13.50 | ContractSUB | Rail |
| 2026-05EIA row 8663 · preliminary | LEE RANCH COAL COMPANY2901879 | Springerville8223 · AZ · PEABODY COAL SALES | 93,886 | 69.93 | 9,460 | 0.59 | 17.50 | ContractSUB | Rail |
| 2026-03EIA row 5056 · preliminary | LEE RANCH COAL COMPANY2901879 | Springerville8223 · AZ · PEABODY COAL SALES | 109,688 | 68.65 | 9,355 | 0.79 | 17.80 | ContractSUB | Rail |
| 2026-02EIA row 3155 · preliminary | LEE RANCH COAL COMPANY2901879 | Springerville8223 · AZ · PEABODY COAL SALES | 187,575 | 68.91 | 9,430 | 0.73 | 16.40 | ContractSUB | Rail |
| 2026-01EIA row 1176 · preliminary | LEE RANCH COAL COMPANY2901879 | Springerville8223 · AZ · PEABODY COAL SALES | 78,328 | 69.58 | 9,505 | 0.80 | 15.10 | ContractSUB | Rail |
| 2025-12EIA row 35481 · final | LEE RANCH COAL COMPANY2901879 | Springerville8223 · AZ · PEABODY COAL SALES | 78,354 | 66.32 | 9,140 | 0.63 | 19.00 | ContractSUB | Rail |
| 2025-11EIA row 32465 · final | LEE RANCH COAL COMPANY2901879 | Springerville8223 · AZ · PEABODY COAL SALES | 109,383 | 67.00 | 9,285 | 0.65 | 17.60 | ContractSUB | Rail |
| 2025-10EIA row 29526 · final | LEE RANCH COAL COMPANY2901879 | Springerville8223 · AZ · PEABODY COAL SALES | 140,939 | 67.10 | 9,320 | 0.75 | 17.10 | ContractSUB | Rail |
| 2025-09EIA row 26472 · final | LEE RANCH COAL COMPANY2901879 | Springerville8223 · AZ · PEABODY COAL SALES | 156,268 | 66.97 | 9,320 | 0.68 | 17.20 | ContractSUB | Rail |
| 2025-08EIA row 23382 · final | LEE RANCH COAL COMPANY2901879 | Springerville8223 · AZ · PEABODY COAL SALES | 172,353 | 67.61 | 9,440 | 0.71 | 16.90 | ContractSUB | Rail |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Lee Ranch Coal Mine2901879 · Mckinley, New Mexico | 1,410,492 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
| El Segundo2902257 · Mckinley, New Mexico | 1,028,982 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.