← Dolese Bros. Co.

Dolese Bros. Co. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Parking procedures for unattended equipment.

    violationRecord 9994482
    Richards Spur Rock Quarry · 3400011

    30 CFR 56.14207 · $151.00 proposed penalty

  2. Grounding circuit enclosures.

    violationRecord 5003603
    Richards Spur Rock Quarry · 3400011

    30 CFR 56.12025 · $151.00 proposed penalty

  3. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5003602
    Richards Spur Rock Quarry · 3400011

    30 CFR 50.30(a) · $151.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord F027F11
    Richards Spur Rock Quarry · 3400011

    29.0 on-site hours reported

  5. Insulation and fittings for power wires and cables.

    violationRecord 9994481
    Richards Spur Rock Quarry · 3400011

    30 CFR 56.12008 · $151.00 proposed penalty

  6. Inspection.

    violationRecord 5003601
    Richards Spur Rock Quarry · 3400011

    30 CFR 56.4201(a)(1) · $151.00 proposed penalty

  7. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9763247
    Hartshorne Quarry · 3400015

    30 CFR 50.30(a) · $151.00 proposed penalty

  8. Regular Safety and Health Inspection

    inspectionRecord 7101494
    Hartshorne Quarry · 3400015

    4.5 on-site hours reported

  9. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9798948
    Coleman Rock Quarry · 3400405

    30 CFR 50.30(a) · $151.00 proposed penalty

  10. Combustible waste.

    violationRecord 9798947
    Coleman Rock Quarry · 3400405

    30 CFR 56.4104(b) · $151.00 proposed penalty

  11. Berms or guardrails.

    violationRecord 9798946
    Coleman Rock Quarry · 3400405

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  12. Identification of power switches.

    violationRecord 9798945
    Coleman Rock Quarry · 3400405

    30 CFR 56.12018 · $151.00 proposed penalty

  13. General requirements.

    violationRecord 9798944
    Coleman Rock Quarry · 3400405

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  14. Requirement for container labels.

    violationRecord 9798943
    Coleman Rock Quarry · 3400405

    30 CFR 47.41(a) · $151.00 proposed penalty

  15. Safety defects; examination, correction and records.

    violationRecord 9798942
    Coleman Rock Quarry · 3400405

    30 CFR 56.14100(b) · $151.00 proposed penalty

  16. Horns and backup alarms.

    violationRecord 9798941
    Coleman Rock Quarry · 3400405

    30 CFR 56.14132(b)(2) · $151.00 proposed penalty

  17. Regular Safety and Health Inspection

    inspectionRecord F015782
    Big Canyon Rock Quarry · 3400014

    15.8 on-site hours reported

  18. Verbal Hazard Complaint Inspections

    inspectionRecord F01231E
    Coleman Rock Quarry · 3400405

    2.8 on-site hours reported

  19. Regular Safety and Health Inspection

    inspectionRecord F01231F
    Coleman Rock Quarry · 3400405

    14.8 on-site hours reported

  20. Regular Safety and Health Inspection

    inspectionRecord F01231C
    Roosevelt Quarry · 3401455

    5.3 on-site hours reported

  21. Handling of materials

    accidentRecord 220250410005
    Big Canyon Rock Quarry · 3400014

    Dys awy frm wrk & restrctd act

    Accident narrative

    Employee smashed EE's finger between equipment and conveyor.

  22. Parking procedures for unattended equipment.

    violationRecord 9747163
    Davis Rock Quarry · 3400798

    30 CFR 56.14207 · $642.00 proposed penalty

  23. Safety defects; examination, correction and records.

    violationRecord 9747162
    Davis Rock Quarry · 3400798

    30 CFR 56.14100(b) · $432.00 proposed penalty

  24. Requirement for container labels.

    violationRecord 9747161
    Davis Rock Quarry · 3400798

    30 CFR 47.41(a)(1) · $432.00 proposed penalty

  25. Electrical conductors.

    violationRecord 9747160
    Davis Rock Quarry · 3400798

    30 CFR 56.12004 · $432.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.