← Dolese Bros. Co.

Dolese Bros. Co. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F0510F1
    Jones Sand Plant · 3402209

    7.0 on-site hours reported

  2. Safety defects; examination, correction and records.

    violationRecord 5175544
    Jones Sand Plant · 3402209

    30 CFR 56.14100(b)

  3. Powered haulage

    accidentRecord 220262430038
    Richards Spur Rock Quarry · 3400011

    No dys awy frm wrk,no rstr act

    Accident narrative

    Man basket popped up with employee inside and they struck their chin on the railing.

  4. Moving machine parts.

    violationRecord 5250212
    Coleman Rock Quarry · 3400405

    30 CFR 56.14107(a) · $151.00 proposed penalty

  5. Identification of power switches.

    violationRecord 5250211
    Coleman Rock Quarry · 3400405

    30 CFR 56.12018 · $151.00 proposed penalty

  6. Housekeeping.

    violationRecord 5250210
    Coleman Rock Quarry · 3400405

    30 CFR 56.20003(a) · $151.00 proposed penalty

  7. Insulation and fittings for power wires and cables.

    violationRecord 5250209
    Coleman Rock Quarry · 3400405

    30 CFR 56.12008 · $151.00 proposed penalty

  8. Housekeeping.

    violationRecord 5250208
    Coleman Rock Quarry · 3400405

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $267.00 proposed penalty

  9. Housekeeping.

    violationRecord 5250207
    Coleman Rock Quarry · 3400405

    30 CFR 56.20003(a) · $151.00 proposed penalty

  10. Construction and maintenance of guards.

    violationRecord 5250206
    Coleman Rock Quarry · 3400405

    30 CFR 56.14112(b) · $151.00 proposed penalty

  11. Inspection.

    violationRecord 5250602
    Roosevelt Quarry · 3401455

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  12. Horns and backup alarms.

    violationRecord 5250601
    Roosevelt Quarry · 3401455

    30 CFR 56.14132(a) · $151.00 proposed penalty

  13. Training plans.

    violationRecord 5178000
    Roosevelt Quarry · 3401455

    30 CFR 46.3(a) · $151.00 proposed penalty

  14. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5177999
    Roosevelt Quarry · 3401455

    30 CFR 50.30(a) · $151.00 proposed penalty

  15. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5177998
    Roosevelt Quarry · 3401455

    30 CFR 50.30(a) · $151.00 proposed penalty

  16. Newly hired experienced miner training.

    violationRecord 5177997
    Roosevelt Quarry · 3401455

    30 CFR 46.6(a) · $151.00 proposed penalty

  17. Newly hired experienced miner training.

    violationRecord 5177996
    Roosevelt Quarry · 3401455

    30 CFR 46.6(a) · $168.00 proposed penalty

  18. Correction of dangerous conditions.

    violationRecord 5177995
    Roosevelt Quarry · 3401455

    30 CFR 56.12030 · Significant and substantial (S&S) · $755.00 proposed penalty

  19. Securing gas cylinders.

    violationRecord 5177994
    Roosevelt Quarry · 3401455

    30 CFR 56.16005 · $151.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 5177993
    Roosevelt Quarry · 3401455

    30 CFR 56.14100(b) · $151.00 proposed penalty

  21. Compliance Follow-up Inspection

    inspectionRecord F03C332
    Richards Spur Rock Quarry · 3400011

    1.3 on-site hours reported

  22. Regular Safety and Health Inspection

    inspectionRecord F03A531
    Coleman Rock Quarry · 3400405

    18.3 on-site hours reported

  23. Regular Safety and Health Inspection

    inspectionRecord F03C331
    Roosevelt Quarry · 3401455

    18.0 on-site hours reported

  24. General requirements.

    violationRecord 5250205
    Coleman Rock Quarry · 3400405

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  25. General requirements.

    violationRecord 5177992
    Richards Spur Rock Quarry · 3400011

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.