← Doe Run Company

Doe Run Company safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Separation of transported explosive material.

    violationRecord 5040216
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6201(b)(2) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  2. Escapeways and refuges.

    violationRecord 9767556
    Viburnum #35 (Casteel Mine) · 2301800

    30 CFR 57.11050(a) · $398.00 proposed penalty

  3. Compliance Follow-up Inspection

    inspectionRecord F01487E
    Sweetwater Mine/Mill · 2300458

    13.0 on-site hours reported

  4. Testing grounding systems.

    violationRecord 9767555
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12028 · $432.00 proposed penalty

  5. Securing gas cylinders.

    violationRecord 9767554
    Fletcher Mine and Mill · 2300409

    30 CFR 57.16005 · $267.00 proposed penalty

  6. Experienced miner training.

    violationRecord 5040081
    Brushy Creek Mine/Mill · 2300499

    30 CFR 48.6(b) · $504.00 proposed penalty

  7. Slip or fall of person

    accidentRecord 220250630006
    Fletcher Mine and Mill · 2300409

    Days restricted activity only

    Accident narrative

    EMPLOYEE WAS MOVING A PUMP, SLIPPED AND TWISTED KNEE.

  8. Other

    accidentRecord 220250630017
    Sweetwater Mine/Mill · 2300458

    Days restricted activity only

    Accident narrative

    EMPLOYEE WAS WALKING ACROSS MILL CONTROL ROOM WHEN EMPLOYEE FELT A POP IN LEFT CALF MUSCLE FOLLOWED BY PAIN.

  9. Securing gas cylinders.

    violationRecord 5040080
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.16005 · $151.00 proposed penalty

  10. Parking procedures for unattended equipment.

    violationRecord 5040079
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14207 · $193.00 proposed penalty

  11. Non-Fatal Accident Investigation

    inspectionRecord F0127C8
    Fletcher Mine and Mill · 2300409

    3.5 on-site hours reported

  12. General requirements.

    violationRecord 9767553
    Fletcher Mine and Mill · 2300409

    30 CFR 57.4200(b)(2) · $177.00 proposed penalty

  13. Testing grounding systems.

    violationRecord 9768322
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12028 · $151.00 proposed penalty

  14. Insulation and fittings for power wires and cables.

    violationRecord 9768321
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12008 · $151.00 proposed penalty

  15. Escape routes.

    violationRecord 5040215
    Fletcher Mine and Mill · 2300409

    30 CFR 57.11051(a) · $151.00 proposed penalty

  16. Vehicles.

    violationRecord 5040214
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6202(b)(1) · $504.00 proposed penalty

  17. Correction of dangerous conditions.

    violationRecord 9768320
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12030 · Significant and substantial (S&S) · $755.00 proposed penalty

  18. Testing grounding systems.

    violationRecord 9768319
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12028 · $151.00 proposed penalty

  19. Electrical conductors.

    violationRecord 9768318
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12004 · $151.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 9768317
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14100(b) · $151.00 proposed penalty

  21. Moving machine parts.

    violationRecord 5040078
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14107(a) · Significant and substantial (S&S) · $755.00 proposed penalty

  22. Waste receptacles.

    violationRecord 5040077
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.20013 · $336.00 proposed penalty

  23. Circuit overload protection.

    violationRecord 9767552
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12001 · $592.00 proposed penalty

  24. Delivery to storage or blast site areas.

    violationRecord 9767551
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6200 · $592.00 proposed penalty

  25. Parking procedures for unattended equipment.

    violationRecord 9767550
    Fletcher Mine and Mill · 2300409

    30 CFR 57.14207 · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.