Doe Run Company safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspection
Brushy Creek Mine/Mill · 23004993.8 on-site hours reported
Preservation of evidence.
Viburnum #35 (Casteel Mine) · 230180030 CFR 50.12 · $151.00 proposed penalty
Immediate notification.
Viburnum #35 (Casteel Mine) · 230180030 CFR 50.10(d) · Significant and substantial (S&S) · $3,263.00 proposed penalty
Housekeeping.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.20003 · Significant and substantial (S&S) · $7,267.00 proposed penalty
Procedures for inspection, testing, and maintenance.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.19120 · Significant and substantial (S&S) · $28,316.00 proposed penalty
Housekeeping.
Brushy Creek Mine/Mill · 230049930 CFR 57.20003(a) · $432.00 proposed penalty
Electrical conductors.
Brushy Creek Mine/Mill · 230049930 CFR 57.12004 · $1,037.00 proposed penalty
Inspection.
Brushy Creek Mine/Mill · 230049930 CFR 57.4201(a)(1) · $226.00 proposed penalty
Electrical conductors.
Buick Mine/Mill · 230045730 CFR 57.12004 · $2,133.00 proposed penalty
Parking procedures for unattended equipment.
Buick Mine/Mill · 230045730 CFR 57.14207 · $151.00 proposed penalty
Testing grounding systems.
Buick Mine/Mill · 230045730 CFR 57.12028 · $2,312.00 proposed penalty
Requirement for container labels.
Buick Mine/Mill · 230045730 CFR 47.41(a) · $398.00 proposed penalty
Electrical conductors.
Buick Mine/Mill · 230045730 CFR 57.12004 · $959.00 proposed penalty
Regular Safety and Health Inspection
Buick Mine/Mill · 230045734.5 on-site hours reported
Initiation systems.
Brushy Creek Mine/Mill · 230049930 CFR 57.6308 · $226.00 proposed penalty
Violation — cited standard not reported
Viburnum #35 (Casteel Mine) · 2301800Non-Injury Accident Investigation
Viburnum #35 (Casteel Mine) · 2301800110.3 on-site hours reported
Housekeeping.
Sweetwater Mine/Mill · 230045830 CFR 57.20003(a) · $1,037.00 proposed penalty
Housekeeping.
Sweetwater Mine/Mill · 230045830 CFR 57.20003(a) · $1,037.00 proposed penalty
Inspection.
Sweetwater Mine/Mill · 230045830 CFR 57.4201(a)(5) · $288.00 proposed penalty
Housekeeping.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.20003(c) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Sweetwater Mine/Mill · 230045830 CFR 57.12008 · $288.00 proposed penalty
Securing movable parts.
Sweetwater Mine/Mill · 230045830 CFR 57.14206(b) · $288.00 proposed penalty
Safety defects; examination, correction and records.
Brushy Creek Mine/Mill · 230049930 CFR 57.14100(b) · $549.00 proposed penalty
Distribution boxes.
Brushy Creek Mine/Mill · 230049930 CFR 57.12006 · $592.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.