← Doe Run Company

Doe Run Company safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Explosive material storage facilities.

    violationRecord 5043456
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6130(d) · $592.00 proposed penalty

  2. Delivery to storage or blast site areas.

    violationRecord 5043455
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6200 · $1,968.00 proposed penalty

  3. Non-Injury Accident Investigation

    inspectionRecord F017EF4
    Viburnum #35 (Casteel Mine) · 2301800

    88.5 on-site hours reported

  4. Distribution boxes.

    violationRecord 5043454
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12006 · $592.00 proposed penalty

  5. Safety defects; examination, correction and records.

    violationRecord 5043453
    Fletcher Mine and Mill · 2300409

    30 CFR 57.14100(b) · $366.00 proposed penalty

  6. Safety defects; examination, correction and records.

    violationRecord 5043452
    Fletcher Mine and Mill · 2300409

    30 CFR 57.14100(b) · $549.00 proposed penalty

  7. Unguarded conveyors with adjacent travelways.

    violationRecord 5043823
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14109(a) · $151.00 proposed penalty

  8. Safety defects; examination, correction and records.

    violationRecord 5043822
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14100(b) · $432.00 proposed penalty

  9. Electrical conductors.

    violationRecord 5043821
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12004 · $366.00 proposed penalty

  10. Parking procedures for unattended equipment.

    violationRecord 5040879
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14207 · $177.00 proposed penalty

  11. Violation — cited standard not reported

    violationRecord 5043029
    Viburnum #35 (Casteel Mine) · 2301800
  12. Fall of roof or back

    accidentRecord 220253210005
    Viburnum #35 (Casteel Mine) · 2301800

    Accident only

    Accident narrative

    EE entered haulage path on vehicle and found backfall across road impeding pathway. Stope: 40ARM

  13. Inspection and cover plates.

    violationRecord 5043028
    Viburnum #29 Mine · 2300495

    30 CFR 57.12032 · $151.00 proposed penalty

  14. Inspection.

    violationRecord 5040878
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.4201(a)(1) · $151.00 proposed penalty

  15. Electrical conductors.

    violationRecord 5040877
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12004 · $288.00 proposed penalty

  16. Location of self-rescue devices.

    violationRecord 5040876
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.15031(b) · $165.00 proposed penalty

  17. Inspection and cover plates.

    violationRecord 5043451
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12032 · $592.00 proposed penalty

  18. Testing grounding systems.

    violationRecord 5043449
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12028 · $592.00 proposed penalty

  19. Parking procedures for unattended equipment.

    violationRecord 5043448
    Fletcher Mine and Mill · 2300409

    30 CFR 57.14207 · $267.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 5043232
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.14100(b) · $313.00 proposed penalty

  21. Electrical conductors.

    violationRecord 5040535
    Viburnum #29 Mine · 2300495

    30 CFR 57.12004 · $151.00 proposed penalty

  22. Testing grounding systems.

    violationRecord 5040875
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12028 · $288.00 proposed penalty

  23. Insulation and fittings for power wires and cables.

    violationRecord 5040874
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12008 · $151.00 proposed penalty

  24. Access to stationary electrical equipment or switchgear.

    violationRecord 5040873
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12019 · Significant and substantial (S&S) · $755.00 proposed penalty

  25. Securing gas cylinders.

    violationRecord 5040872
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.16005 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.