← Doe Run Company

Doe Run Company safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Testing grounding systems.

    violationRecord 5043510
    Buick Mine/Mill · 2300457

    30 CFR 57.12028 · $504.00 proposed penalty

  2. Safety defects; examination, correction and records.

    violationRecord 5043052
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14100(c) · Significant and substantial (S&S) · $818.00 proposed penalty

  3. Inspection and cover plates.

    violationRecord 5043051
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12032 · $165.00 proposed penalty

  4. Limit on exposure to diesel particulate matter.

    violationRecord 5043753
    Fletcher Mine and Mill · 2300409

    30 CFR 57.5060(b)(3) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  5. Limit on exposure to diesel particulate matter.

    violationRecord 5043754
    Viburnum #35 (Casteel Mine) · 2301800

    30 CFR 57.5060(b)(3) · Significant and substantial (S&S) · $697.00 proposed penalty

  6. Compliance Follow-up Inspection

    inspectionRecord F01480C
    Fletcher Mine and Mill · 2300409

    8.0 on-site hours reported

  7. Testing grounding systems.

    violationRecord 5048396
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.12028 · $336.00 proposed penalty

  8. Testing grounding systems.

    violationRecord 5048395
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.12028 · $336.00 proposed penalty

  9. Design of switches and starting boxes.

    violationRecord 5043509
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.12041 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  10. Main facilities.

    violationRecord 5043508
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.6160(b)(2)(i) · $592.00 proposed penalty

  11. Distribution boxes.

    violationRecord 5043050
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12006 · $151.00 proposed penalty

  12. Electrical conductors.

    violationRecord 5048394
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.12004 · $336.00 proposed penalty

  13. Safety defects; examination, correction and records.

    violationRecord 5048393
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.14100(b) · $592.00 proposed penalty

  14. Testing grounding systems.

    violationRecord 5043507
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.12028 · $1,126.00 proposed penalty

  15. Escapeways and refuges.

    violationRecord 5043049
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.11050(a) · $165.00 proposed penalty

  16. Insulation and fittings for power wires and cables.

    violationRecord 5043048
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12008 · $549.00 proposed penalty

  17. Berms or guardrails.

    violationRecord 5043047
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.9300(a) · $151.00 proposed penalty

  18. Testing grounding systems.

    violationRecord 5048392
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.12028 · $398.00 proposed penalty

  19. Testing grounding systems.

    violationRecord 5048391
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.12028 · $398.00 proposed penalty

  20. Regular Safety and Health Inspection

    inspectionRecord F027E36
    Sweetwater Mine/Mill · 2300458

    121.3 on-site hours reported

  21. Testing grounding systems.

    violationRecord 5048390
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.12028 · $398.00 proposed penalty

  22. Combustible waste.

    violationRecord 5048389
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.4104(b)(1) · $313.00 proposed penalty

  23. Housekeeping.

    violationRecord 5048388
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.20003(a) · $818.00 proposed penalty

  24. Inspection.

    violationRecord 5048387
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.4201(a)(1) · $313.00 proposed penalty

  25. Testing grounding systems.

    violationRecord 5048386
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.12028 · $398.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.