DC Caliche LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Dawn Pit · 410530230 CFR 50.30(a)
Warning signs.
Dawn Pit · 410530230 CFR 56.4101
Requirement for container labels.
Dawn Pit · 410530230 CFR 47.41(a)
Insulation and fittings for power wires and cables.
Dawn Pit · 410530230 CFR 56.12008
Danger signs.
Dawn Pit · 410530230 CFR 56.12021
Safety defects; examination, correction and records.
Dawn Pit · 410530230 CFR 56.14100(c)
Regular Safety and Health Inspection
Dawn Pit · 410530211.0 on-site hours reported
Other
Dawn Pit · 4105302Injuries due to natural causes
Accident narrative
Employee wasn't feeling well went to car and tried to leave other employee stopped EE to check on EE. figured out EE was having a heart attack pulled EE out Checked Vitals found no pulse and started CPR on EE. Employee called 911 and MSHA. EMS Arrived on location. and took EE to the hospital.
Spot Inspection
Dawn Pit · 410530214.3 on-site hours reported
Compliance Follow-up Inspection
Dawn Pit · 41053020.0 on-site hours reported
Compliance Follow-up Inspection
Dawn Pit · 41053021.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Dawn Pit · 410530230 CFR 50.30(a) · $151.00 proposed penalty
Guarding electrical connections and resistor grids.
Dawn Pit · 410530230 CFR 56.12023 · $151.00 proposed penalty
Moving machine parts.
Dawn Pit · 410530230 CFR 56.14107(a) · $151.00 proposed penalty
Warning signs.
Dawn Pit · 410530230 CFR 56.4101 · $151.00 proposed penalty
Oxygen cylinder storage.
Dawn Pit · 410530230 CFR 56.4601 · $151.00 proposed penalty
Securing gas cylinders.
Dawn Pit · 410530230 CFR 56.16005 · $151.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Dawn Pit · 410530230 CFR 56.14130(g) · Significant and substantial (S&S) · $209.00 proposed penalty
Moving machine parts.
Dawn Pit · 410530230 CFR 56.14107(a) · $151.00 proposed penalty
Electrical conductors.
Dawn Pit · 410530230 CFR 56.12004 · $151.00 proposed penalty
Spillage and leakage.
Dawn Pit · 410530230 CFR 56.4102 · $151.00 proposed penalty
General requirements.
Dawn Pit · 410530230 CFR 56.4200(b)(2) · $151.00 proposed penalty
Safety can use.
Dawn Pit · 410530230 CFR 56.4402 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Dawn Pit · 410530230 CFR 56.14100(b) · $151.00 proposed penalty
Berms or guardrails.
Dawn Pit · 410530230 CFR 56.9300(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.