CSI Sands NE Ltd safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
DOCK #1 WHISKEY ISLAND · 330255130 CFR 56.20003(a) · $226.00 proposed penalty
Safety defects; examination, correction and records.
DOCK #1 WHISKEY ISLAND · 330255130 CFR 56.14100(b) · $336.00 proposed penalty
Inspection and cover plates.
DOCK #1 WHISKEY ISLAND · 330255130 CFR 56.12032 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Examination of working places.
DOCK #1 WHISKEY ISLAND · 330255130 CFR 56.18002(a) · Significant and substantial (S&S) · $4,152.00 proposed penalty
Safety defects; examination, correction and records.
DOCK #1 WHISKEY ISLAND · 330255130 CFR 56.14100(b) · $3,022.00 proposed penalty
Safety defects; examination, correction and records.
DOCK #1 WHISKEY ISLAND · 330255130 CFR 56.14100(b) · Significant and substantial (S&S) · $12,403.00 proposed penalty
Regular Safety and Health Inspection
DOCK #1 WHISKEY ISLAND · 330255137.8 on-site hours reported
Machinery, equipment, and tools.
BUFFALO DOCK · 300326130 CFR 56.14205 · Significant and substantial (S&S) · $7,084.00 proposed penalty
Moving machine parts.
BUFFALO DOCK · 300326130 CFR 56.14107(a) · Significant and substantial (S&S) · $27,603.00 proposed penalty
Compliance Follow-up Inspection
BUFFALO DOCK · 30032618.5 on-site hours reported
Housekeeping.
BUFFALO DOCK · 300326130 CFR 56.20003(a) · Significant and substantial (S&S) · $81,369.00 proposed penalty
Compliance Follow-up Inspection
BUFFALO DOCK · 300326116.8 on-site hours reported
Protection of power conductors from mobile equipment.
BUFFALO DOCK · 300326130 CFR 56.12005 · $288.00 proposed penalty
Construction and maintenance of guards.
BUFFALO DOCK · 300326130 CFR 56.14112(b) · $432.00 proposed penalty
Safe access.
BUFFALO DOCK · 300326130 CFR 56.11001 · Significant and substantial (S&S) · $4,749.00 proposed penalty
Protection for openings around travelways.
BUFFALO DOCK · 300326130 CFR 56.11012 · $432.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
BUFFALO DOCK · 300326130 CFR 50.30(a) · $151.00 proposed penalty
Records of training.
BUFFALO DOCK · 300326130 CFR 46.9(c)(1)(iii) · $151.00 proposed penalty
Safety defects; examination, correction and records.
BUFFALO DOCK · 300326130 CFR 56.14100(b) · $883.00 proposed penalty
Construction and maintenance of guards.
BUFFALO DOCK · 300326130 CFR 56.14112(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Inspection and cover plates.
BUFFALO DOCK · 300326130 CFR 56.12032 · $288.00 proposed penalty
Identification of power switches.
BUFFALO DOCK · 300326130 CFR 56.12018 · $288.00 proposed penalty
Construction and maintenance of guards.
BUFFALO DOCK · 300326130 CFR 56.14112(b) · $432.00 proposed penalty
Inspection.
BUFFALO DOCK · 300326130 CFR 56.4201(a)(1) · $288.00 proposed penalty
Protection for openings around travelways.
BUFFALO DOCK · 300326130 CFR 56.11012 · Significant and substantial (S&S) · $4,749.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.