Travelways at surface installations.
Oak Grove Preparation Plant · 010032930 CFR 77.205(b) · Significant and substantial (S&S) · $313.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Oak Grove Mine · 010085130 CFR 75.1909(a)(1) · $267.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
Oak Grove Mine · 010085130 CFR 75.1910(d) · $267.00 proposed penalty
Spot Inspections
Oak Grove Mine · 0100851103(i) · 3.5 on-site hours reported
Spot Inspections
Oak Grove Mine · 0100851103(i) · 3.5 on-site hours reported
Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements.
Oak Grove Preparation Plant · 010032930 CFR 77.216-3(c) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Oak Grove Mine · 010085130 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Maintenance of diesel-powered equipment.
Oak Grove Mine · 010085130 CFR 75.1914(a) · $288.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Oak Grove Mine · 010085130 CFR 75.1909(a)(3)(xi) · $267.00 proposed penalty
Machinery and equipment; operation and maintenance.
Oak Grove Mine · 010085130 CFR 75.1725(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $592.00 proposed penalty
Permissible electric face equipment; maintenance.
Oak Grove Mine · 010085130 CFR 75.503 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Machinery and equipment; operation and maintenance.
Oak Grove Mine · 010085130 CFR 75.1725(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Non-Injury Accident Investigation
Oak Grove Preparation Plant · 010032918.5 on-site hours reported
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
Oak Grove Mine · 010085130 CFR 75.1910(f) · $267.00 proposed penalty
Condition and examination of firefighting equipment.
Oak Grove Mine · 010085130 CFR 75.1100-3 · $336.00 proposed penalty
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · $432.00 proposed penalty
Protection from falls of roof, face and ribs.
Oak Grove Mine · 010085130 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Investigation.
Oak Grove Mine · 010085130 CFR 50.11(b)(8) · $267.00 proposed penalty
Insulating mats at power switches.
Oak Grove Mine · 010085130 CFR 77.513 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Inspection and cover plates.
Oak Grove Mine · 010085130 CFR 77.512 · $398.00 proposed penalty
Insulating mats at power switches.
Oak Grove Mine · 010085130 CFR 77.513 · $267.00 proposed penalty
Flammable liquids; storage.
Oak Grove Mine · 010085130 CFR 77.1103(b) · $267.00 proposed penalty
Hoisting
Oak Grove Mine · 0100851Accident only
Accident narrative
The SP Elevator was taken out of service due to an electrical issue with multiple switches after chipping ice from the shaft. The ice was chipped, the switches were repaired, the float cables repaired, the elevator tested, and placed back into service. MSHA was notified via the hotline.
Regular Safety and Health Inspection
Oak Grove Preparation Plant · 010032931.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.