Crimson Oak Grove Resources LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
103 (g) Written Notification Hazard Complaint Inspectio
Oak Grove Mine · 01008512.8 on-site hours reported
Spot Inspections
Oak Grove Mine · 0100851103(i) · 0.8 on-site hours reported
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
Oak Grove Mine · 010085130 CFR 75.370(a)(1) · $2,133.00 proposed penalty
Sampling; general and technical requirements.
Oak Grove Mine · 010085130 CFR 70.201(c) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Spot Inspections
Oak Grove Mine · 0100851103(i) · 5.5 on-site hours reported
Protection from falls of roof, face and ribs.
Oak Grove Mine · 010085130 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Slip or fall of person
Oak Grove Mine · 0100851Days away from work only
Accident narrative
IE was walking when EE tripped over a rock and fell hitting EE's elbow on the ground.
103 (g) Written Notification Hazard Complaint Inspectio
Oak Grove Mine · 010085116.0 on-site hours reported
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $755.00 proposed penalty
Other safeguards.
Oak Grove Mine · 010085130 CFR 75.1403 · Significant and substantial (S&S) · $6,037.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $2,936.00 proposed penalty
Requirement for container labels.
Oak Grove Mine · 010085130 CFR 47.41(a) · $465.00 proposed penalty
Quantity and location of firefighting equipment.
Oak Grove Mine · 010085130 CFR 75.1100-2(f) · $313.00 proposed penalty
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · $2,133.00 proposed penalty
Ventilation controls.
Oak Grove Mine · 010085130 CFR 75.333(b)(1) · $1,037.00 proposed penalty
Protection from falls of roof, face and ribs.
Oak Grove Mine · 010085130 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $2,503.00 proposed penalty
Protection from falls of roof, face and ribs.
Oak Grove Mine · 010085130 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · $2,133.00 proposed penalty
Protection from falls of roof, face and ribs.
Oak Grove Mine · 010085130 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Oak Grove Mine · 010085130 CFR 75.512 · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Oak Grove Mine · 010085130 CFR 75.512 · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Oak Grove Mine · 010085130 CFR 75.512 · $465.00 proposed penalty
Power wires and cables; insulation and protection.
Oak Grove Mine · 010085130 CFR 75.517 · $398.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.