Crimson Oak Grove Resources LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · $642.00 proposed penalty
Identification of circuit breakers.
Oak Grove Mine · 010085130 CFR 75.904 · $313.00 proposed penalty
Short circuit protection of trailing cables.
Oak Grove Mine · 010085130 CFR 75.601 · $313.00 proposed penalty
Handling of materials
Oak Grove Mine · 0100851Days away from work only
Accident narrative
IE was recovering tubes when they dropped the tubes and it rolled down their knee hyperextending it.
Electric equipment; examination, testing and maintenance.
Oak Grove Mine · 010085130 CFR 75.512 · $504.00 proposed penalty
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Mechanical equipment guards.
Oak Grove Mine · 010085130 CFR 75.1722(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $818.00 proposed penalty
Spot Inspections
Oak Grove Mine · 0100851103(i) · 6.3 on-site hours reported
Transformers; installation and guarding.
Oak Grove Mine · 010085130 CFR 77.509(c) · $1,037.00 proposed penalty
Communications facilities; refuge alternatives.
Oak Grove Mine · 010085130 CFR 75.1600-3(a)(2) · $209.00 proposed penalty
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · $592.00 proposed penalty
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · $592.00 proposed penalty
Condition and examination of firefighting equipment.
Oak Grove Mine · 010085130 CFR 75.1100-3 · $165.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $818.00 proposed penalty
Ventilation controls.
Oak Grove Mine · 010085130 CFR 75.333(h) · $398.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Oak Grove Mine · 010085130 CFR 75.512 · $504.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Oak Grove Mine · 010085130 CFR 75.512 · $504.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Oak Grove Mine · 010085130 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Spot Inspections
Oak Grove Mine · 0100851103(i) · 9.5 on-site hours reported
Protection from falls of roof, face and ribs.
Oak Grove Mine · 010085130 CFR 75.202(a) · $245.00 proposed penalty
Ventilation controls.
Oak Grove Mine · 010085130 CFR 75.333(h) · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
Oak Grove Mine · 010085130 CFR 75.370(a)(1) · $504.00 proposed penalty
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · $267.00 proposed penalty
Permissible electric face equipment; maintenance.
Oak Grove Mine · 010085130 CFR 75.503 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.