Continental Cement Company, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Machinery
Hannibal Underground · 2302434No dys awy frm wrk,no rstr act
Accident narrative
EE was attempting to free material with an air wand and felt a pop in right shoulder area. Reported late because no pain was felt for a few days.
Safety defects; examination, correction and records.
Davenport Plant · 130012530 CFR 56.14100(b) · $151.00 proposed penalty
Temporary, portable containers.
Davenport Plant · 130012530 CFR 47.44(b) · $151.00 proposed penalty
High-pressure hose connections.
Davenport Plant · 130012530 CFR 56.13021 · $549.00 proposed penalty
High-pressure hose connections.
Davenport Plant · 130012530 CFR 56.13021 · $549.00 proposed penalty
Construction and maintenance of ladders.
Davenport Plant · 130012530 CFR 56.11003 · $165.00 proposed penalty
Moving machine parts.
Davenport Plant · 130012530 CFR 56.14107(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Davenport Plant · 130012530 CFR 56.14112(a)(1) · $245.00 proposed penalty
Testing grounding systems.
Davenport Plant · 130012530 CFR 56.12028 · $165.00 proposed penalty
Construction and maintenance of guards.
Davenport Plant · 130012530 CFR 56.14112(a)(2) · Significant and substantial (S&S) · $818.00 proposed penalty
Stacking and storage of materials.
Davenport Plant · 130012530 CFR 56.16001 · $165.00 proposed penalty
Temporary, portable containers.
Davenport Plant · 130012530 CFR 47.44(b) · $165.00 proposed penalty
Warning signs.
Davenport Plant · 130012530 CFR 56.4101 · $165.00 proposed penalty
Abandoned electric circuits.
Davenport Plant · 130012530 CFR 56.4011 · $151.00 proposed penalty
Construction and maintenance of ladders.
Davenport Plant · 130012530 CFR 56.11003 · $165.00 proposed penalty
Combustible waste.
Davenport Plant · 130012530 CFR 56.4104(a) · $165.00 proposed penalty
Safety defects; examination, correction and records.
Davenport Plant · 130012530 CFR 56.14100(b) · $549.00 proposed penalty
High-pressure hose connections.
Davenport Plant · 130012530 CFR 56.13021 · $549.00 proposed penalty
High-pressure hose connections.
Davenport Plant · 130012530 CFR 56.13021 · $549.00 proposed penalty
General requirements.
Davenport Plant · 130012530 CFR 56.4200(b)(2) · $193.00 proposed penalty
Correction of dangerous conditions.
Davenport Plant · 130012530 CFR 56.12030 · $288.00 proposed penalty
Securing gas cylinders.
Davenport Plant · 130012530 CFR 56.16005 · $193.00 proposed penalty
High-pressure hose connections.
Davenport Plant · 130012530 CFR 56.13021 · $193.00 proposed penalty
Housekeeping.
Davenport Plant · 130012530 CFR 56.20003(a) · $209.00 proposed penalty
Gauges and regulators.
Davenport Plant · 130012530 CFR 56.4602 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.