Continental Cement Company, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
Hannibal Underground · 230243430 CFR 57.20003(a) · $193.00 proposed penalty
Safe access.
Hannibal Underground · 230243430 CFR 57.11001 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Housekeeping.
Hannibal Underground · 230243430 CFR 57.20003(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Regular Safety and Health Inspection
Owensville Plant · 23010384.0 on-site hours reported
Safe access.
Hannibal Underground · 230243430 CFR 57.11001 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Safety defects; examination, correction and records.
Hannibal Underground · 230243430 CFR 57.14100(b) · $193.00 proposed penalty
Inspection and cover plates.
Hannibal Underground · 230243430 CFR 57.12032 · $432.00 proposed penalty
Gauges and regulators.
Hannibal Underground · 230243430 CFR 57.4602 · $151.00 proposed penalty
Construction and maintenance of guards.
Hannibal Underground · 230243430 CFR 57.14112(b) · $642.00 proposed penalty
Examination of working places.
Hannibal Underground · 230243430 CFR 57.18002(a) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Safety defects; examination, correction and records.
Hannibal Underground · 230243430 CFR 57.14100(b) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Safety defects; examination, correction and records.
Hannibal Underground · 230243430 CFR 57.14100(b) · Significant and substantial (S&S) · $959.00 proposed penalty
Moving machine parts.
Hannibal Underground · 230243430 CFR 57.14107(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Housekeeping.
Hannibal Underground · 230243430 CFR 57.20003(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Moving machine parts.
Hannibal Underground · 230243430 CFR 57.14107(a) · $336.00 proposed penalty
Temporary, portable containers.
Hannibal Underground · 230243430 CFR 47.44(b) · $151.00 proposed penalty
Combustible waste.
Hannibal Underground · 230243430 CFR 57.4104(a) · $151.00 proposed penalty
Housekeeping.
Hannibal Underground · 230243430 CFR 57.20003(a) · $245.00 proposed penalty
Electrical conductors.
Hannibal Underground · 230243430 CFR 57.12004 · $151.00 proposed penalty
Construction and maintenance of guards.
Hannibal Underground · 230243430 CFR 57.14112(b) · $193.00 proposed penalty
Handtools (nonpowered)
Davenport Plant · 1300125Days restricted activity only
Accident narrative
Employee was using folding utility knife to remove broken plastic fitting from tube. Knife folded and cut employee's right index finger. Employee received 3 stitches
Availability of an MSDS.
Hannibal Underground · 230243430 CFR 47.54 · $642.00 proposed penalty
Protective equipment and clothing for hazards and irritants.
Hannibal Underground · 230243430 CFR 57.15006 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Combustible waste.
Hannibal Underground · 230243430 CFR 57.4104(a) · $165.00 proposed penalty
Regular Safety and Health Inspection
Hannibal Underground · 2302434127.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.