Continental Cement Company, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Distribution boxes.
Midlothian Quarry and Plant · 410007130 CFR 56.12006 · $288.00 proposed penalty
Inspection and cover plates.
Midlothian Quarry and Plant · 410007130 CFR 56.12032 · $151.00 proposed penalty
Warning signs.
Midlothian Quarry and Plant · 410007130 CFR 56.4101 · $151.00 proposed penalty
Requirement for container labels.
Midlothian Quarry and Plant · 410007130 CFR 47.41(a) · $151.00 proposed penalty
Requirement for container labels.
Midlothian Quarry and Plant · 410007130 CFR 47.41(a)(1) · $151.00 proposed penalty
Inspection.
Midlothian Quarry and Plant · 410007130 CFR 56.4201(a)(2) · $151.00 proposed penalty
Testing grounding systems.
Midlothian Quarry and Plant · 410007130 CFR 56.12028 · $151.00 proposed penalty
Housekeeping.
Midlothian Quarry and Plant · 410007130 CFR 56.20003(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Housekeeping.
Midlothian Quarry and Plant · 410007130 CFR 56.20003(a) · $959.00 proposed penalty
Combustible waste.
Midlothian Quarry and Plant · 410007130 CFR 56.4104(a) · $288.00 proposed penalty
Requirement for container labels.
Midlothian Quarry and Plant · 410007130 CFR 47.41(a) · $288.00 proposed penalty
New task training.
Midlothian Quarry and Plant · 410007130 CFR 46.7(a) · $168.00 proposed penalty
Requirement for container labels.
Midlothian Quarry and Plant · 410007130 CFR 47.41(a)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
Midlothian Quarry and Plant · 410007182.5 on-site hours reported
Moving machine parts.
Hannibal Underground · 230243430 CFR 57.14107(a) · $642.00 proposed penalty
Fire
Davenport Plant · 1300125Accident only
Accident narrative
At 11:20pm, a non-conforming item went through high speed shredders at Green America facility which resulted in a fire. Contacted MSHA at approximately 1130pm to notify them of the incident. Fire department arrived on site at 12am to assist with putting out the fire.
General requirements.
Hannibal Underground · 230243430 CFR 57.4200(a)(1) · $209.00 proposed penalty
Electrical conductors.
Hannibal Underground · 230243430 CFR 57.12004 · $465.00 proposed penalty
Verbal Hazard Complaint Inspections
Hannibal Underground · 23024344.0 on-site hours reported
Safety defects; examination, correction and records.
Hannibal Underground · 230243430 CFR 57.14100(b) · $151.00 proposed penalty
Housekeeping.
Hannibal Underground · 230243430 CFR 57.20003(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Electrical conductors.
Hannibal Underground · 230243430 CFR 57.12004 · $1,550.00 proposed penalty
Safety belts and lines.
Hannibal Underground · 230243430 CFR 57.15005 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Exits for surface buildings and structures.
Hannibal Underground · 230243430 CFR 57.4530 · $697.00 proposed penalty
First aid materials.
Hannibal Underground · 230243430 CFR 57.15001 · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.