Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bailey Mine · 360723030 CFR 75.1725(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(c)(1) · $193.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $336.00 proposed penalty
Escapeways; bituminous and lignite mines.
HARVEY MINE · 361004530 CFR 75.380(d)(7)(i) · $151.00 proposed penalty
Accumulation of combustible materials.
HARVEY MINE · 361004530 CFR 75.400 · $151.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 6.5 on-site hours reported
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 8.3 on-site hours reported
Water, sediment, or slurry impoundments and impounding structures; general.
Bailey Mine · 360723030 CFR 77.216(d) · $193.00 proposed penalty
Transformers; installation and guarding.
Bailey Mine · 360723030 CFR 77.509(c) · $151.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(b) · $151.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(b) · $209.00 proposed penalty
Openings in surface installations; safeguards.
Bailey Mine · 360723030 CFR 77.204 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
ENLOW FORK MINE · 360741630 CFR 77.404(c) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $151.00 proposed penalty
Daily examination of hoisting equipment.
Bailey Mine · 360723030 CFR 77.1403(a)(2) · $193.00 proposed penalty
Surface installations; general.
Bailey Mine · 360723030 CFR 77.200 · $193.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
Bailey Mine · 360723030 CFR 75.1103-4(b) · $151.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $288.00 proposed penalty
Roof control plan.
Bailey Mine · 360723030 CFR 75.220(a)(1) · $151.00 proposed penalty
Identification of circuit breakers.
Bailey Mine · 360723030 CFR 75.904 · $151.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(c)(3) · $193.00 proposed penalty
Accumulation of combustible materials.
HARVEY MINE · 361004530 CFR 75.400 · $151.00 proposed penalty
Other safeguards.
HARVEY MINE · 361004530 CFR 75.1403 · $177.00 proposed penalty
Handtools (nonpowered)
ENLOW FORK MINE · 3607416No dys awy frm wrk,no rstr act
Accident narrative
Employee was trimming excess belt from a splice with a utility knife. The employees utility knife slipped from the belt and cut the employee on the right thigh. Employee received three sutures.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.