Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $504.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(c)(3) · $288.00 proposed penalty
Hoisting
HARVEY MINE · 3610045Accident only
Accident narrative
The elevator at Patterson Creek portal was out of service due to the a set of the rope gripper pads becoming damaged. The pads where replaced. The VFD also faulted during this time period, requiring it to be replaced and reprogrammed. Once work completed the elevator returned to normal service.
Spot Inspections
Bailey Mine · 3607230103(i) · 3.0 on-site hours reported
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $288.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
Bailey Mine · 360723030 CFR 75.1103-4(b) · $193.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(h) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Bailey Mine · 360723030 CFR 75.512 · $226.00 proposed penalty
Communications facilities; refuge alternatives.
ENLOW FORK MINE · 360741630 CFR 75.1600-3(a)(2) · $151.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(h) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
ENLOW FORK MINE · 360741630 CFR 75.1731(b) · $151.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(a) · $151.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Bailey Mine · 360723030 CFR 75.1106-3(a)(3) · $151.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $288.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $288.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(h) · $151.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $245.00 proposed penalty
Condition and examination of firefighting equipment.
Bailey Mine · 360723030 CFR 75.1100-3 · $193.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(d)(3) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(a) · $226.00 proposed penalty
Mechanical equipment guards.
Bailey Mine · 360723030 CFR 75.1722(c) · $193.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $288.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.