Condition and examination of firefighting equipment.
Bailey Mine · 360723030 CFR 75.1100-3 · $151.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(h) · $151.00 proposed penalty
Identification of circuit breakers.
Bailey Mine · 360723030 CFR 75.904 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Bailey Mine · 360723030 CFR 75.202(a) · $151.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $313.00 proposed penalty
Mechanical equipment guards.
Bailey Mine · 360723030 CFR 75.1722(a) · $642.00 proposed penalty
Roof control plan.
Bailey Mine · 360723030 CFR 75.220(a)(1) · $151.00 proposed penalty
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 3.5 on-site hours reported
Inspection of fire suppression devices.
Bailey Mine · 360723030 CFR 75.1107-16(b) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Bailey Mine · 360723030 CFR 75.512 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bailey Mine · 360723030 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Bailey Mine · 360723030 CFR 75.512 · $245.00 proposed penalty
Testing, examination and maintenance.
Bailey Mine · 360723030 CFR 75.821(d) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Bailey Mine · 360723030 CFR 75.517 · $193.00 proposed penalty
Identification of circuit breakers.
Bailey Mine · 360723030 CFR 75.904 · $193.00 proposed penalty
Maintenance of incombustible content of rock dust.
ENLOW FORK MINE · 360741630 CFR 75.403 · $151.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $151.00 proposed penalty
Handtools (nonpowered)
HARVEY MINE · 3610045No dys awy frm wrk,no rstr act
Accident narrative
Employee was attempting to set a jack in the roof to secure a tailpiece during a belt move. The jack needed lowered for adjustment. When they set the jack down, the employee's hand was caught between the jack and the tailpiece. Injury was not the result of a training or compliance issue.
Spot Inspections
Bailey Mine · 3607230103(i) · 5.5 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 6.0 on-site hours reported
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $313.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $313.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(b) · $209.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bailey Mine · 360723030 CFR 75.1725(a) · $151.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.