Condition and examination of firefighting equipment.
HARVEY MINE · 361004530 CFR 75.1100-3 · $151.00 proposed penalty
Roof Control Technical Investigation
Bailey Mine · 360723013.0 on-site hours reported
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(b) · $193.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(b) · $193.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
ENLOW FORK MINE · 360741630 CFR 75.1103-4(b) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Bailey Mine · 360723030 CFR 75.380(d)(7)(i) · $151.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(h) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(b) · $151.00 proposed penalty
Fire suppression devices; extinguishant supply systems.
Bailey Mine · 360723030 CFR 75.1107-8(a)(2) · $151.00 proposed penalty
Mechanical equipment guards.
Bailey Mine · 360723030 CFR 75.1722(a) · $288.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Permissible electric face equipment; maintenance.
Bailey Mine · 360723030 CFR 75.503 · $151.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $288.00 proposed penalty
Underground electrical installations.
ENLOW FORK MINE · 360741630 CFR 75.340(a)(1)(i) · $151.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · Significant and substantial (S&S) · $755.00 proposed penalty
Roof control plan.
ENLOW FORK MINE · 360741630 CFR 75.220(a)(1) · $209.00 proposed penalty
Ventilation controls.
HARVEY MINE · 361004530 CFR 75.333(h) · $151.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
HARVEY MINE · 361004530 CFR 75.1002(a) · $165.00 proposed penalty
Guarding of cables.
HARVEY MINE · 361004530 CFR 75.816(a)(1) · $165.00 proposed penalty
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 4.5 on-site hours reported
Other safeguards.
ENLOW FORK MINE · 360741630 CFR 75.1403 · $193.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(h) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
HARVEY MINE · 361004530 CFR 75.1731(b) · $151.00 proposed penalty
Condition and examination of firefighting equipment.
HARVEY MINE · 361004530 CFR 75.1100-3 · $151.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 6.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.