Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
ENLOW FORK MINE · 360741630 CFR 75.1714-3(a) · $642.00 proposed penalty
Other safeguards.
ENLOW FORK MINE · 360741630 CFR 75.1403 · $209.00 proposed penalty
Accumulation of combustible materials.
HARVEY MINE · 361004530 CFR 75.400 · $151.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 4.0 on-site hours reported
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 6.0 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 5.0 on-site hours reported
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $151.00 proposed penalty
Roof control plan.
Bailey Mine · 360723030 CFR 75.220(a)(1) · $151.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(e)(1)(i) · $151.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(h) · $151.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
ENLOW FORK MINE · 360741630 CFR 75.1107-4(a)(2)(ii) · $151.00 proposed penalty
Roof control plan.
ENLOW FORK MINE · 360741630 CFR 75.220(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $313.00 proposed penalty
Spot Inspections
HARVEY MINE · 3610045103(i) · 6.5 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(b) · $151.00 proposed penalty
Mechanical equipment guards.
Bailey Mine · 360723030 CFR 75.1722(a) · $193.00 proposed penalty
Roof control plan.
Bailey Mine · 360723030 CFR 75.220(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Bailey Mine · 360723030 CFR 75.370(a)(1) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(b) · $151.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Bailey Mine · 360723030 CFR 75.202(a) · $209.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $336.00 proposed penalty
Mining machines, cap lamps; requirements.
Bailey Mine · 360723030 CFR 75.1719-4(b) · $151.00 proposed penalty
Roof control plan.
Bailey Mine · 360723030 CFR 75.220(a)(1) · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.