Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection from falls of roof, face and ribs.
ENLOW FORK MINE · 360741630 CFR 75.202(a) · $151.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $336.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Bailey Mine · 360723030 CFR 75.512 · $226.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
Bailey Mine · 360723030 CFR 77.516 · $151.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $151.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(h) · $151.00 proposed penalty
Other safeguards.
ENLOW FORK MINE · 360741630 CFR 75.1403 · $151.00 proposed penalty
Escapeway maps.
ENLOW FORK MINE · 360741630 CFR 75.1505(b) · $193.00 proposed penalty
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 6.5 on-site hours reported
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Protection from falls of roof, face and ribs.
Bailey Mine · 360723030 CFR 75.202(a) · $151.00 proposed penalty
Identification of circuit breakers.
Bailey Mine · 360723030 CFR 75.904 · $151.00 proposed penalty
On-shift examination.
Bailey Mine · 360723030 CFR 75.362(d)(1)(iii) · $193.00 proposed penalty
Drill dust control at underground areas of underground mines.
Bailey Mine · 360723030 CFR 72.630(b) · $288.00 proposed penalty
Grounding frames of stationary high-voltage equipment receiving power from ungrounded delta systems.
Bailey Mine · 360723030 CFR 75.704 · $193.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $336.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $151.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $151.00 proposed penalty
Slip or fall of person
Bailey Mine · 3607230No dys awy frm wrk,no rstr act
Accident narrative
The employee's pant leg got caught up in a fallen down branch while walking a stream for environmental monitoring. Upon trying to free EE's pant leg from the branch, EE lost EE's balance, fell and cut EE's left palm on a rock, requiring five sutures.
Escapeways; bituminous and lignite mines.
Bailey Mine · 360723030 CFR 75.380(d)(7)(vii)(B) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bailey Mine · 360723030 CFR 75.1725(a) · $209.00 proposed penalty
Permissible electric face equipment; maintenance.
Bailey Mine · 360723030 CFR 75.503 · $642.00 proposed penalty
Inspection of fire suppression devices.
Bailey Mine · 360723030 CFR 75.1107-16(b) · $193.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
ENLOW FORK MINE · 360741630 CFR 75.1731(b) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
ENLOW FORK MINE · 360741630 CFR 75.517 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.