Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Escapeways; bituminous and lignite mines.
ENLOW FORK MINE · 360741630 CFR 75.380(d)(7)(vii) · $245.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 8.5 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 5.0 on-site hours reported
Automatic fire sensors and manual actuators; installation; minimum requirements.
Bailey Mine · 360723030 CFR 75.1107-4(a)(2) · $151.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $288.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
HARVEY MINE · 361004530 CFR 75.370(a)(1) · Significant and substantial (S&S) · $465.00 proposed penalty
Mechanical equipment guards.
HARVEY MINE · 361004530 CFR 75.1722(a) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
HARVEY MINE · 361004530 CFR 77.404(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Storage of materials.
HARVEY MINE · 361004530 CFR 77.208(d) · $151.00 proposed penalty
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 8.5 on-site hours reported
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(a) · $151.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $336.00 proposed penalty
Handling of materials
Bailey Mine · 3607230Dys awy frm wrk & restrctd act
Accident narrative
Employee struck by screen deck during deck replacement. Employee struck by deck between deck and chute of screen in the hop area. Initial treatment sought on 11/16/25 with a follow up to specialist for final diagnosis on 12/1/25. Final diagnosis of pelvic and tailbone fracture. Employee was not pinned.
Maintenance of belt conveyors and belt conveyor entries.
ENLOW FORK MINE · 360741630 CFR 75.1731(b) · $151.00 proposed penalty
Escapeway maps.
ENLOW FORK MINE · 360741630 CFR 75.1505(b) · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
ENLOW FORK MINE · 360741630 CFR 75.512 · $151.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 6.0 on-site hours reported
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 7.5 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 8.0 on-site hours reported
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $336.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(b) · $193.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(a) · $193.00 proposed penalty
Water, sediment, or slurry impoundments and impounding structures; minimum plan requirements; changes or modifications; certification.
Bailey Mine · 360723030 CFR 77.216-2(b) · $642.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.