Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $398.00 proposed penalty
Roof control plan.
ENLOW FORK MINE · 360741630 CFR 75.220(a)(1) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
HARVEY MINE · 361004530 CFR 75.403 · $151.00 proposed penalty
Machinery
ENLOW FORK MINE · 3607416No dys awy frm wrk,no rstr act
Accident narrative
EE was operating the headgate side of the shearer, while snaking back into the coal block employee was standing 5 shields away when EE was struck by a piece of coal measuring 3"x4"x1" thick resulting in a fracture of the Maxillary sinus.
Spot Inspections
Bailey Mine · 3607230103(i) · 7.5 on-site hours reported
Health Technical Investigation
HARVEY MINE · 361004511.3 on-site hours reported
Protection from falls of roof, face and ribs.
Bailey Mine · 360723030 CFR 75.202(a) · $151.00 proposed penalty
Accumulations of combustible materials.
Bailey Mine · 360723030 CFR 77.1104 · $245.00 proposed penalty
Mechanical equipment guards.
Bailey Mine · 360723030 CFR 77.400(a) · Significant and substantial (S&S) · $549.00 proposed penalty
Mechanical equipment guards.
Bailey Mine · 360723030 CFR 77.400(a) · Significant and substantial (S&S) · $549.00 proposed penalty
Ladders; construction; installation and maintenance.
Bailey Mine · 360723030 CFR 77.206(e) · $151.00 proposed penalty
Insulating mats at power switches.
Bailey Mine · 360723030 CFR 77.513 · $151.00 proposed penalty
Fall of roof or back
ENLOW FORK MINE · 3607416Accident only
Accident narrative
An unintentional roof fall occurred in the H7 Tailgate section, #2 entry, inby 36 wall. The fall was approximately 7' high x 16' wide x 30' long. The immediate roof consisted of laminated shale type material. Adverse geological conditions contributed to the fall. No injuries occurred because of this accident.
Non-Injury Accident Investigation
ENLOW FORK MINE · 36074169.5 on-site hours reported
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(b) · $151.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $226.00 proposed penalty
Violation — cited standard not reported
ENLOW FORK MINE · 3607416Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(h) · $151.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(h) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
HARVEY MINE · 361004530 CFR 75.1731(b) · $151.00 proposed penalty
Ventilation controls.
HARVEY MINE · 361004530 CFR 75.333(h) · $151.00 proposed penalty
Health Technical Investigation
ENLOW FORK MINE · 360741610.5 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 6.0 on-site hours reported
Condition and examination of firefighting equipment.
Bailey Mine · 360723030 CFR 75.1100-3 · $151.00 proposed penalty
Machinery
ENLOW FORK MINE · 3607416Days away from work only
Accident narrative
EE was pulling shields in, one advanced striking employees feet resulting in 2 broken toes and 2 broken metatarsals.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.