  1. Shaft, Slope or Major Construction Spot Inspection

    inspectionRecord F0136BC
    HARVEY MINE · 3610045

    12.0 on-site hours reported

  2. Machinery and equipment; operation and maintenance.

    violationRecord 9824656
    Bailey Mine · 3607230

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  3. Frequency of examinations.

    violationRecord 5156248
    ENLOW FORK MINE · 3607416

    30 CFR 75.512-2 · $151.00 proposed penalty

  4. Identification of circuit breakers.

    violationRecord 5156247
    ENLOW FORK MINE · 3607416

    30 CFR 75.904 · $193.00 proposed penalty

  5. Slip or fall of person

    accidentRecord 220261820010
    ENLOW FORK MINE · 3607416

    Days restricted activity only

    Accident narrative

    EE was standing, when they went to turn and start walking they tripped. EE sustained a laceration to left pinky finger when EE caught themself on a pie pan resulting in 3 stitches.

  6. Machinery and equipment; operation and maintenance.

    violationRecord 5156246
    HARVEY MINE · 3610045

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  7. Slip or fall of person

    accidentRecord 220261800012
    Bailey Mine · 3607230

    Days restricted activity only

    Accident narrative

    Mechanic stepped off a work scaffold and rolled/twisted EE's right ankle.

  8. Ignition or explosion of gas or dust

    accidentRecord 220261730061
    HARVEY MINE · 3610045

    Accident only

    Accident narrative

    An ignition occurred in the 3N miner section, while mining through a sandstone intrusion.

  9. Machinery

    accidentRecord 220261760023
    Bailey Mine · 3607230

    Days away from work only

    Accident narrative

    While drilling a hole to install a 20ft roof bolt, the top steel got stuck in the hole, while retrieving the steel out of the roof, it inadvertently fell pinching their right pinky finger between two steels, causing a laceration and fracture of the tip of their finger

  10. Mechanical equipment guards.

    violationRecord 9188261
    Bailey Mine · 3607230

    30 CFR 77.400(a) · Significant and substantial (S&S) · $818.00 proposed penalty

  11. Compliance with approved slope and shaft sinking plans.

    violationRecord 9188260
    Bailey Mine · 3607230

    30 CFR 77.1900-1 · $165.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9939937
    Bailey Mine · 3607230

    30 CFR 75.400 · $226.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 9939936
    Bailey Mine · 3607230

    30 CFR 75.400 · $226.00 proposed penalty

  14. Roof control plan.

    violationRecord 9939935
    Bailey Mine · 3607230

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 7104312
    Bailey Mine · 3607230

    30 CFR 75.400 · $226.00 proposed penalty

  16. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 5156245
    ENLOW FORK MINE · 3607416

    30 CFR 75.1103-4(b) · $151.00 proposed penalty

  17. Ventilation controls.

    violationRecord 5150259
    ENLOW FORK MINE · 3607416

    30 CFR 75.333(h) · $151.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F02F240
    Bailey Mine · 3607230

    103(i) · 5.5 on-site hours reported

  19. Shaft, Slope or Major Construction Spot Inspection

    inspectionRecord F014127
    Bailey Mine · 3607230

    13.0 on-site hours reported

  20. Spot Inspections

    inspectionRecord F007020
    ENLOW FORK MINE · 3607416

    103(i) · 6.0 on-site hours reported

  21. Health Technical Investigation

    inspectionRecord F00F048
    HARVEY MINE · 3610045

    11.0 on-site hours reported

  22. Spot Inspections

    inspectionRecord F00BAC3
    HARVEY MINE · 3610045

    103(i) · 3.5 on-site hours reported

  23. Mine ventilation plan; submission and approval.

    violationRecord 7104311
    Bailey Mine · 3607230

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 7104310
    Bailey Mine · 3607230

    30 CFR 75.400 · $226.00 proposed penalty

  25. Roof control plan.

    violationRecord 9121315
    Bailey Mine · 3607230

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.