Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(e) · $151.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $226.00 proposed penalty
Verbal Hazard Complaint Inspections
Bailey Mine · 36072307.0 on-site hours reported
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(e)(1)(i) · $151.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(e)(1)(i) · $245.00 proposed penalty
Identification of circuit breakers.
ENLOW FORK MINE · 360741630 CFR 75.904 · $151.00 proposed penalty
Handtools (nonpowered)
ENLOW FORK MINE · 3607416No dys awy frm wrk,no rstr act
Accident narrative
Employee was using a bit extractor fork and a 4lb hammer to remove bits from the miner in 2 South left. A piece of the extractor tool chipped off and struck the employee in the right arm. Employee was treated at hospital with 3 stitches and returned to work the next schedule shift.
Mine ventilation plan; submission and approval.
Bailey Mine · 360723030 CFR 75.370(a)(1) · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
Bailey Mine · 360723030 CFR 75.370(a)(1) · $642.00 proposed penalty
Loading and haulage equipment; installations.
Bailey Mine · 360723030 CFR 77.1605(k) · $151.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $177.00 proposed penalty
Electric equipment; examination, testing and maintenance.
ENLOW FORK MINE · 360741630 CFR 75.512 · Significant and substantial (S&S) · $883.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $226.00 proposed penalty
Inspection of fire suppression devices.
ENLOW FORK MINE · 360741630 CFR 75.1107-16(a) · $165.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
ENLOW FORK MINE · 360741630 CFR 75.1002(a) · $165.00 proposed penalty
Automatic emergency-parking brakes.
ENLOW FORK MINE · 360741630 CFR 75.523-3(b)(1) · Significant and substantial (S&S) · $818.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
HARVEY MINE · 361004530 CFR 75.1107-4(c) · $151.00 proposed penalty
Ventilation controls.
HARVEY MINE · 361004530 CFR 75.333(d)(3) · $151.00 proposed penalty
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 2.5 on-site hours reported
Health Technical Investigation
ENLOW FORK MINE · 360741611.8 on-site hours reported
Machinery and equipment; operation and maintenance.
ENLOW FORK MINE · 360741630 CFR 75.1725(a) · $151.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $151.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 5.5 on-site hours reported
Health Technical Investigation
HARVEY MINE · 361004511.0 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 4.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.