Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Automatic fire sensor and warning device systems; installation; minimum requirements.
ENLOW FORK MINE · 360741630 CFR 75.1103-4(b) · $151.00 proposed penalty
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 5.0 on-site hours reported
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $151.00 proposed penalty
Roof control plan.
Bailey Mine · 360723030 CFR 75.220(a)(1) · $151.00 proposed penalty
Requirement for container labels.
Bailey Mine · 360723030 CFR 47.41(a)(1) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
ENLOW FORK MINE · 360741630 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
ENLOW FORK MINE · 360741630 CFR 75.1106-3(a)(2) · $193.00 proposed penalty
Handtools (nonpowered)
Bailey Mine · 3607230No dys awy frm wrk,no rstr act
Accident narrative
Employee was working with a 30mil chain on the Crabapple slope bottom while hooking up supply cars. EE pinched right middle finger between the chain and the general car causing a laceration. EE was treated with 6 stitches and released for work. EE returned on next scheduled shift.
Roof bolting.
Bailey Mine · 360723030 CFR 75.204(f)(7) · $193.00 proposed penalty
Condition and examination of firefighting equipment.
Bailey Mine · 360723030 CFR 75.1100-3 · Significant and substantial (S&S) · $432.00 proposed penalty
Escapeways; bituminous and lignite mines.
Bailey Mine · 360723030 CFR 75.380(d)(7)(vii)(B) · $12,403.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $151.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $336.00 proposed penalty
Roof control plan.
ENLOW FORK MINE · 360741630 CFR 75.220(a)(1) · $209.00 proposed penalty
Permissible electric face equipment; maintenance.
ENLOW FORK MINE · 360741630 CFR 75.503 · $151.00 proposed penalty
Air quality.
ENLOW FORK MINE · 360741630 CFR 75.321(a)(1) · $151.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 6.0 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 11.0 on-site hours reported
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $313.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(b) · $151.00 proposed penalty
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $151.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(c)(3) · $193.00 proposed penalty
Transformers; installation and guarding.
Bailey Mine · 360723030 CFR 77.509(c) · $151.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
HARVEY MINE · 361004511.0 on-site hours reported
Spot Inspections
Bailey Mine · 3607230103(i) · 5.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.