Identification of circuit breakers.
Bailey Mine · 360723030 CFR 75.904 · $151.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(h) · $151.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $313.00 proposed penalty
Cable fittings; suitability.
ENLOW FORK MINE · 360741630 CFR 75.515 · $193.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 6.5 on-site hours reported
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 4.5 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 5.0 on-site hours reported
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(h) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
ENLOW FORK MINE · 360741630 CFR 75.370(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
ENLOW FORK MINE · 360741630 CFR 75.512 · $151.00 proposed penalty
Handling of materials
Bailey Mine · 3607230Days away from work only
Accident narrative
Contractor bent over a generator panel to change an alternator belt. This caused a back injury.
Other
Bailey Mine · 3607230Days away from work only
Accident narrative
Bailey Prep Plant employee was climbing onto a screenbowl to install the spray bar when they felt a pop and after some time felt a burning sensation. The employee began to miss work on 03-24-2025.
Protection from falls of roof, face and ribs.
Bailey Mine · 360723030 CFR 75.202(a) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bailey Mine · 360723030 CFR 75.1725(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bailey Mine · 360723030 CFR 75.1725(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $151.00 proposed penalty
Daily examination of hoisting equipment.
Bailey Mine · 360723030 CFR 75.1400-3(b)(3) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bailey Mine · 360723030 CFR 75.1725(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Identification of circuit breakers.
ENLOW FORK MINE · 360741630 CFR 75.904 · $642.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(c)(3) · $193.00 proposed penalty
Underground electrical installations.
Bailey Mine · 360723030 CFR 75.340(a)(1)(i) · $151.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(h) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Bailey Mine · 360723030 CFR 77.1606(c) · $151.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(a) · $151.00 proposed penalty
Belt air course ventilation.
ENLOW FORK MINE · 360741630 CFR 75.350(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.