Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Insulating mats at power switches.
Bailey Mine · 360723030 CFR 77.513 · $288.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(a) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Bailey Mine · 360723030 CFR 77.502 · $313.00 proposed penalty
Mine ventilation plan; submission and approval.
ENLOW FORK MINE · 360741630 CFR 75.370(a)(1) · $151.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(h) · $226.00 proposed penalty
Inspection of fire suppression devices.
ENLOW FORK MINE · 360741630 CFR 75.1107-16(b) · $151.00 proposed penalty
Maintenance of diesel-powered equipment.
ENLOW FORK MINE · 360741630 CFR 75.1914(a) · $151.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $151.00 proposed penalty
Automatic emergency-parking brakes.
ENLOW FORK MINE · 360741630 CFR 75.523-3(b)(5) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
ENLOW FORK MINE · 360741630 CFR 75.517 · $151.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 4.0 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 5.5 on-site hours reported
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $151.00 proposed penalty
Roof control plan.
Bailey Mine · 360723030 CFR 75.220(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $151.00 proposed penalty
Conventional roof support.
ENLOW FORK MINE · 360741630 CFR 75.206(e) · $193.00 proposed penalty
Accumulation of combustible materials.
ENLOW FORK MINE · 360741630 CFR 75.400 · $336.00 proposed penalty
Ventilation controls.
ENLOW FORK MINE · 360741630 CFR 75.333(h) · $226.00 proposed penalty
Maintenance of incombustible content of rock dust.
ENLOW FORK MINE · 360741630 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
ENLOW FORK MINE · 360741630 CFR 75.403 · $151.00 proposed penalty
Quantity and location of firefighting equipment.
ENLOW FORK MINE · 360741630 CFR 75.1100-2(f) · $151.00 proposed penalty
Handling of materials
ENLOW FORK MINE · 3607416Days away from work only
Accident narrative
Employee was loading supplies onto a roof bolter and felt pain in their back. Injury was not witnessed, and after an investigation, it was decided on 3/19/2025 that this could not be attributed to anything but the work activity the day of the report. Injury was not the result of a training or compliance issue.
Electric equipment; examination, testing and maintenance.
Bailey Mine · 360723030 CFR 75.512 · $245.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Bailey Mine · 360723030 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Underground electrical installations.
ENLOW FORK MINE · 360741630 CFR 75.340(a)(1)(i) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.